T1 - Work breakdown structure (WBS) dictionary development for the construction works of flyover projects
AU - Latief, Y.
AU - Kusumaningtyas, G. R.
AU - Supriadi, L. S.R.
N1 - Publisher Copyright:
© 2018 Institute of Physics Publishing. All rights reserved.
PY - 2018/12/14
Y1 - 2018/12/14
N2 - The construction works of flyover is common in a developing country as well as developed country all over the world. Flyover is an infrastructure that is built to overcome the massive congestion that cannot be overcome with the use of traffic light. In the construction process of a flyover, traffic is the one main problem that always occurred. To minimize that problem, the flyover construction should be planned and managed effectively. With the development of WBS and dictionary of WBS, the project stages will be planned and managed in details that can be used to analyse work packages, defined methods, activities, and resources that will help to decrease the occurring problems. The WBS Dictionary for the construction works of flyover projects in this study is developed using archive analysis and survey methods, which consists of six (6) levels including project name, division, sub of works, work packages, activities, and resources.
AB - The construction works of flyover is common in a developing country as well as developed country all over the world. Flyover is an infrastructure that is built to overcome the massive congestion that cannot be overcome with the use of traffic light. In the construction process of a flyover, traffic is the one main problem that always occurred. To minimize that problem, the flyover construction should be planned and managed effectively. With the development of WBS and dictionary of WBS, the project stages will be planned and managed in details that can be used to analyse work packages, defined methods, activities, and resources that will help to decrease the occurring problems. The WBS Dictionary for the construction works of flyover projects in this study is developed using archive analysis and survey methods, which consists of six (6) levels including project name, division, sub of works, work packages, activities, and resources.
KW - WBS
KW - WBS dictionary
KW - construction works
KW - flyover
UR - http://www.scopus.com/inward/record.url?scp=85062824151&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/195/1/012003
DO - 10.1088/1755-1315/195/1/012003
M3 - Conference article
AN - SCOPUS:85062824151
VL - 195
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
SN - 1755-1307
IS - 1
M1 - 012003
T2 - 2nd International Conference on Eco Engineering Development 2018, ICEED 2018
Y2 - 5 September 2018 through 6 September 2018
ER -