Work breakdown structure (WBS) dictionary development for the construction works of flyover projects

Y. Latief, G. R. Kusumaningtyas, L. S.R. Supriadi

Research output: Contribution to journalConference articlepeer-review

3 Citations (Scopus)

Abstract

The construction works of flyover is common in a developing country as well as developed country all over the world. Flyover is an infrastructure that is built to overcome the massive congestion that cannot be overcome with the use of traffic light. In the construction process of a flyover, traffic is the one main problem that always occurred. To minimize that problem, the flyover construction should be planned and managed effectively. With the development of WBS and dictionary of WBS, the project stages will be planned and managed in details that can be used to analyse work packages, defined methods, activities, and resources that will help to decrease the occurring problems. The WBS Dictionary for the construction works of flyover projects in this study is developed using archive analysis and survey methods, which consists of six (6) levels including project name, division, sub of works, work packages, activities, and resources.

Original languageEnglish
Article number012003
JournalIOP Conference Series: Earth and Environmental Science
Volume195
Issue number1
DOIs
Publication statusPublished - 14 Dec 2018
Event2nd International Conference on Eco Engineering Development 2018, ICEED 2018 - Tangerang, Indonesia
Duration: 5 Sept 20186 Sept 2018

Keywords

  • WBS
  • WBS dictionary
  • construction works
  • flyover

Fingerprint

Dive into the research topics of 'Work breakdown structure (WBS) dictionary development for the construction works of flyover projects'. Together they form a unique fingerprint.

Cite this