The development of safety plan using Work Breakdown Structure (WBS) for Building Information Modeling (BIM)-based building structure work

Anrio Wira Putra Lim, Yusuf Latief

Research output: Contribution to journalArticlepeer-review

4 Citations (Scopus)

Fingerprint

Dive into the research topics of 'The development of safety plan using Work Breakdown Structure (WBS) for Building Information Modeling (BIM)-based building structure work'. Together they form a unique fingerprint.

Mathematics

Physics & Astronomy

Chemical Compounds

Engineering & Materials Science