The development of risk-based standardized WBS (Work Breakdown Structure) for cost estimation of concrete Precast bridge construction

Remi Fitriadi Kurnia, Yusuf Latief, Leni Sagita Riantini

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

5 Citations (Scopus)

Abstract

The proper Work Breakdown Structure (WBS) is very important in project planning so that deliverables and project work can be broken down into smaller components, more easily to construct and costs can be better controlled. Construction of concrete precast bridges is the dominant type of bridge construction used in Indonesia because it provides many advantages over the other types of construction. Although the project is unique, the works on the construction of Precast bridges and their elements are relatively similar, so they can be standardized and used as a basis for project control. This study aims to create WBS Precast Bridge construction standards and identify risk variables on the work packages, activities and resources on the construction of concrete precast bridges for improved project cost performance. This study provides results that the WBS standard of concrete precast bridge construction consists of 6 levels, with 13 dominant risk variables and 5 risk response recommendation groups against project cost estimates as the development of WBS standards.

Original languageEnglish
Title of host publicationProceedings of the International Conference on Industrial Engineering and Operations Management, IEOM 2018
PublisherIEOM Society
Pages731-739
Number of pages9
ISBN (Print)9781532359446
Publication statusPublished - 2018
Event8th International Conference on Industrial Engineering and Operations Management, IEOM 2018 - Bandung, Indonesia
Duration: 6 Mar 20188 Mar 2018

Publication series

NameProceedings of the International Conference on Industrial Engineering and Operations Management
Volume2018-March
ISSN (Electronic)2169-8767

Conference

Conference8th International Conference on Industrial Engineering and Operations Management, IEOM 2018
Country/TerritoryIndonesia
CityBandung
Period6/03/188/03/18

Keywords

  • Cost estimation
  • Precast bridge
  • Risk
  • WBS

Fingerprint

Dive into the research topics of 'The development of risk-based standardized WBS (Work Breakdown Structure) for cost estimation of concrete Precast bridge construction'. Together they form a unique fingerprint.

Cite this