Keyphrases
Impact Analysis
100%
Biomass Power Plant
100%
Techno-economic Assessment
100%
Economic Risk
100%
Risk Impact
100%
Plant Economics
100%
Model Impact
100%
Bamboo Biomass
100%
Economic Model
100%
Internal Rate of Return
66%
Payback Period
66%
Net Present Value
66%
Power Plant
66%
Indonesia
33%
Renewable Energy
33%
Economic Analysis
33%
Economic Potential
33%
Power Generation
33%
Local Farmers
33%
Electricity Demand
33%
Environmental Benefits
33%
Economic Benefits
33%
Bamboo
33%
Levelized Cost of Energy
33%
Energy Diversification
33%
Power Purchase Agreement
33%
Risk Mitigation
33%
Rate Factor
33%
Effective Maintenance
33%
Gasification Technology
33%
Capacity Factor
33%
Conditional Value at Risk
33%
Risk Method
33%
Agreement Rate
33%
Employee Training
33%
Renewable Energy Capacity
33%
Maintenance Training
33%
Unplanned Shutdown
33%
Energy Transition
33%
Long-term Cooperation
33%
Engineering
Techno-Economic Assessment
100%
Electric Power Plant
100%
Net Present Value
40%
Internal Rate of Return
40%
Payback Period
40%
Renewable Energy
40%
Simulation Result
20%
Power Generation
20%
Economic Potential
20%
Economic Benefit
20%
Electricity Demand
20%
Return Period
20%
Levelized Cost of Electricity
20%
Energy Capacity
20%
Gasification Technology
20%
Environmental Benefit
20%
Capacity Factor
20%
Energy Transition
20%