Keyphrases
Central Java
100%
Techno-economic Analysis
100%
Electricity Generation
100%
Gasification System
100%
Municipal Solid Waste Management
100%
Municipal Solid Waste Gasification
100%
Solid Waste
66%
Indonesia
33%
Public-private Partnership
33%
Investment Cost
33%
Waste-to-energy
33%
Capital Budgeting Techniques
33%
Electrical Energy
33%
Downdraft Fixed Bed
33%
Gasification
33%
Municipal Solid Waste
33%
Fuel Resources
33%
Potential Power
33%
Management Infrastructure
33%
Energy Concept
33%
Energy Technology
33%
Generating Capacity
33%
Surakarta
33%
Investment Project
33%
Concession Period
33%
Engine System
33%
Transfer Method
33%
Power Generating
33%
Build Method
33%
Volume of Solid
33%
CH4 Emission
33%
Fixed Bed Gasification
33%
Engineering
Power Generation
100%
Municipal Solid Waste
100%
Gasification System
100%
Waste Gasification
100%
Solid Waste Management
50%
Gasification
33%
Investment Cost
16%
Methane
16%
Electrical Energy
16%
Waste to Energy
16%
Downdraft
16%
Fixed Bed
16%
Energy Technology
16%
Generating Capacity
16%
Engine System
16%
Earth and Planetary Sciences
Municipal Solid Waste
100%
Gasification
100%
Energy Generation
100%
Municipal Solid Waste Management
75%
Solid Waste
50%
Indonesia
25%
Methane
25%
Emissions
25%
Energy Technology
25%
Chemical Engineering
Gasification
100%
Techno-economic Analysis
100%
Municipal Solid Waste Management
75%