Technical and financial analysis of a mini-hydro power plant 2x500 kW Bandung Regency, Indonesia

H Prabowo, B Sudiarto

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The new regulation of Indonesia Energy and Mineral Resource Minister PERMEN ESDM 50, 2017 changed the tariff of mini-hydro power plant in the Bandung Regency from Rp. 1,200/kWh to Rp.850/kWh. Although the tariff change, the regulation is going to be build owned after 20 years. It needs investment recalculation according to the new tariff. The technical studies show the potential electrical energy and the turbine's type. The financial analysis provided the feasibility of the project used IRR, NPV, and Payback period method. The variable used is the EPC cost of some turbine brands and civil work. This paper informed that the project is feasible for investment and construction. The results of the calculation are IRR 9,69%, NPV RP. 8.373.579.334 and the Payback period 7 years and 9 months.

Original languageEnglish
Title of host publicationThe 5th Annual Applied Science and Engineering Conference (AASEC 2020)
Volume1098
Edition4
DOIs
Publication statusPublished - 1 Mar 2021

Publication series

NameIOP Conference Series: Materials Science and Engineering
PublisherIOP Publishing Ltd.
ISSN (Print)1757-8981

Fingerprint

Dive into the research topics of 'Technical and financial analysis of a mini-hydro power plant 2x500 kW Bandung Regency, Indonesia'. Together they form a unique fingerprint.

Cite this