Study of Feasibility Planning Micro Hydro Power Plant in Kampung Mului, Paser

Rizky Monica Virgine, Rudy Setiabudy

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Kampung Mului is one of the villages in the area of Paser, East Kalimantan. Kampung Mului has not received electricity from PLN so that people who lived in there use generator set for daily needs. Kampung Mului conditions is a fundamental reason for the empowering potential of a waterfall in Kampung Mului be a source of Micro Hydro Power (MHP). In this study, discussed the feasibility of investing MHP economically use comparative expenses Village MHP Mului 20 years of operation with the public electricity expenses Kampung Mului if not wearing the MHP The results of the research show the potential power of Kampung Mului waterfall is 116.08 kW and electricity needs of Kampung Mului is 19, 92 kW. The cost of using Kampung Mului community using a generator set is bigger than the cost of using PLTMH which is Rp 2.791.210.000, if using underground cable and Rp 1.394.110.000, - if using ACSR cable. Based on this, the development of PLTMH Kampung Mului is feasible to be implemented in economic terms. This study can be applied and helps the electricity problem in Kampung Mului.

Original languageEnglish
Title of host publicationProceedings of the 2nd International Conference on High Voltage Engineering and Power Systems
Subtitle of host publicationTowards Sustainable and Reliable Power Delivery, ICHVEPS 2019
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781728126692
DOIs
Publication statusPublished - Oct 2019
Event2nd International Conference on High Voltage Engineering and Power Systems, ICHVEPS 2019 - Denpasar, Bali, Indonesia
Duration: 1 Oct 20194 Oct 2019

Publication series

NameProceedings of the 2nd International Conference on High Voltage Engineering and Power Systems: Towards Sustainable and Reliable Power Delivery, ICHVEPS 2019

Conference

Conference2nd International Conference on High Voltage Engineering and Power Systems, ICHVEPS 2019
CountryIndonesia
CityDenpasar, Bali
Period1/10/194/10/19

Keywords

  • Kampung Mului
  • Micro Hydro Power
  • Paser
  • PLTMH
  • Renewable Energy

Fingerprint Dive into the research topics of 'Study of Feasibility Planning Micro Hydro Power Plant in Kampung Mului, Paser'. Together they form a unique fingerprint.

Cite this