Aceptación social al desarrollo geotérmico en Indonesia

Translated title of the contribution: Social acceptance to geothermal development in Indonesia

Hariyadi, Paulus Wirutomo, Setyo S. Moersidik, S. Witoro Sularno

Research output: Contribution to journalArticle

Abstract

This article examines the relationship between the strengthening quality of socio-cultural life elements (SCL) and the issue of social acceptance to geothermal power plant (GPP) development, focusing on the GPP project in Baturraden, Central Java, Indonesia. This study uses a qualitative approach with the data collection method based on the results of the survey and SEM analysis. As a result, the mission of creating a balance in economic, environmental, and social interests as understood in a sustainable development paradigm becomes a necessity. In conclusion, through the co-existential state engagement, social support in the GPP development will be more easily achieved.

Original languageSpanish
Pages (from-to)331-345
Number of pages15
JournalOpcion
Volume35
Issue numberSpecialEdition24
Publication statusPublished - 1 Jan 2019

Fingerprint

power plant
Indonesia
acceptance
data collection method
social support
sustainable development
paradigm
economics
Acceptance

Keywords

  • Acceptance
  • Development
  • Geothermal
  • Role
  • Social

Cite this

Hariyadi, Wirutomo, P., Moersidik, S. S., & Sularno, S. W. (2019). Aceptación social al desarrollo geotérmico en Indonesia. Opcion, 35(SpecialEdition24), 331-345.
Hariyadi, ; Wirutomo, Paulus ; Moersidik, Setyo S. ; Sularno, S. Witoro. / Aceptación social al desarrollo geotérmico en Indonesia. In: Opcion. 2019 ; Vol. 35, No. SpecialEdition24. pp. 331-345.
@article{221c17e1e0b9433d86fed55d6241312f,
title = "Aceptaci{\'o}n social al desarrollo geot{\'e}rmico en Indonesia",
abstract = "This article examines the relationship between the strengthening quality of socio-cultural life elements (SCL) and the issue of social acceptance to geothermal power plant (GPP) development, focusing on the GPP project in Baturraden, Central Java, Indonesia. This study uses a qualitative approach with the data collection method based on the results of the survey and SEM analysis. As a result, the mission of creating a balance in economic, environmental, and social interests as understood in a sustainable development paradigm becomes a necessity. In conclusion, through the co-existential state engagement, social support in the GPP development will be more easily achieved.",
keywords = "Acceptance, Development, Geothermal, Role, Social",
author = "Hariyadi and Paulus Wirutomo and Moersidik, {Setyo S.} and Sularno, {S. Witoro}",
year = "2019",
month = "1",
day = "1",
language = "Spanish",
volume = "35",
pages = "331--345",
journal = "Opcion",
issn = "1012-1587",
publisher = "Universidad del Zulia",
number = "SpecialEdition24",

}

Hariyadi, , Wirutomo, P, Moersidik, SS & Sularno, SW 2019, 'Aceptación social al desarrollo geotérmico en Indonesia', Opcion, vol. 35, no. SpecialEdition24, pp. 331-345.

Aceptación social al desarrollo geotérmico en Indonesia. / Hariyadi, ; Wirutomo, Paulus; Moersidik, Setyo S.; Sularno, S. Witoro.

In: Opcion, Vol. 35, No. SpecialEdition24, 01.01.2019, p. 331-345.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Aceptación social al desarrollo geotérmico en Indonesia

AU - Hariyadi,

AU - Wirutomo, Paulus

AU - Moersidik, Setyo S.

AU - Sularno, S. Witoro

PY - 2019/1/1

Y1 - 2019/1/1

N2 - This article examines the relationship between the strengthening quality of socio-cultural life elements (SCL) and the issue of social acceptance to geothermal power plant (GPP) development, focusing on the GPP project in Baturraden, Central Java, Indonesia. This study uses a qualitative approach with the data collection method based on the results of the survey and SEM analysis. As a result, the mission of creating a balance in economic, environmental, and social interests as understood in a sustainable development paradigm becomes a necessity. In conclusion, through the co-existential state engagement, social support in the GPP development will be more easily achieved.

AB - This article examines the relationship between the strengthening quality of socio-cultural life elements (SCL) and the issue of social acceptance to geothermal power plant (GPP) development, focusing on the GPP project in Baturraden, Central Java, Indonesia. This study uses a qualitative approach with the data collection method based on the results of the survey and SEM analysis. As a result, the mission of creating a balance in economic, environmental, and social interests as understood in a sustainable development paradigm becomes a necessity. In conclusion, through the co-existential state engagement, social support in the GPP development will be more easily achieved.

KW - Acceptance

KW - Development

KW - Geothermal

KW - Role

KW - Social

UR - http://www.scopus.com/inward/record.url?scp=85077640058&partnerID=8YFLogxK

M3 - Article

AN - SCOPUS:85077640058

VL - 35

SP - 331

EP - 345

JO - Opcion

JF - Opcion

SN - 1012-1587

IS - SpecialEdition24

ER -

Hariyadi , Wirutomo P, Moersidik SS, Sularno SW. Aceptación social al desarrollo geotérmico en Indonesia. Opcion. 2019 Jan 1;35(SpecialEdition24):331-345.