Scheduling for Indonesia's Aircraft Wing Structure Design Project with Critical Path Method and Resource-Constrained Project Scheduling

Melissa Putri Hidayat, M. Dachyar, Farizal

Research output: Contribution to journalConference articlepeer-review

Abstract

As an archipelagic country, Indonesia has high needs for its aviation development. About 270 million people are predicted to fly from and within Indonesia in 2034, which is three times larger than current market conditions. Due to the complexity of aircraft development projects, management of a well-designed Indonesian aircraft design project needs to be implemented. This research aims to analyze the scheduling of aircraft wing structure design project made in Indonesia. Critical Path Method (CPM) and Resource-Constrained Project Scheduling (RCPS) are used to get better scheduling with a shorter duration to complete the project. Results from resource allocation using RCPS can yield a shorter project duration (730 working days) compared to the company's normal resource allocation (950 working days).

Original languageEnglish
Article number03010
JournalMATEC Web of Conferences
Volume248
DOIs
Publication statusPublished - 10 Dec 2018
Event4th Engineering Science and Technology International Conference, ESTIC 2018 - Padang, West Sumatra, Indonesia
Duration: 28 Aug 201829 Aug 2018

Fingerprint

Dive into the research topics of 'Scheduling for Indonesia's Aircraft Wing Structure Design Project with Critical Path Method and Resource-Constrained Project Scheduling'. Together they form a unique fingerprint.

Cite this