Abstract
Loading and unloading process are the main activity that operated by PT. Pelabuhan Tanjung Priok. The operational activity occurs during fully 24 hours with very high flows. This condition affects the accident level of the area, the accident report of PT. Pelabuhan Tanjung Priok shows there are 75 case of accident by December 2015 and 45 % of the accident took place in container yard. Rubber tyred gantry crane is a tool operates in the container yard . The mobility of this tool is quite high due to wear rubber tires Thus, to prevent the study of risk assasement and its control plan of lift off process using ruberr tyred gantry crane are needed by using fault tree analysis to trace the root of the problems of each risk. the results obtained that there main activity have a highest risk, the risk is sling broken with value about 300, because of that the Lift off activities having A class from qualitative risk assesment. researcher making management recommendations of recruitment , training , tools, testing and commissioning tools, then recommendations to RTGC safety features Standard and Chart of safety report.
Original language | English |
---|---|
DOIs | |
Publication status | Published - 2017 |
Event | RJOAS: Russian Journal of Agricultural and Socio-Economic Sciences - RU, Rusia, Russian Federation Duration: 1 Jan 2017 → … |
Conference
Conference | RJOAS: Russian Journal of Agricultural and Socio-Economic Sciences |
---|---|
Country/Territory | Russian Federation |
City | Rusia |
Period | 1/01/17 → … |
Keywords
- Risk assesment, safety management, fault tree analysisis, port, loading, rubber tyred gantry crane.