TY - JOUR
T1 - Road performance analysis due to Sayung Industrial Park development
AU - Sirait, R. D.
AU - Sumabrata, R. J.
AU - Anumasta, N. T.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2024
Y1 - 2024
N2 - This study aims to analyze the impact of Sayung Industrial Park development to the surrounding road network. The study merely relies on available secondary data, including recent transport study in Semarang Raya, trip rate, and previous research related on industrial area occupancy growth. Road performance in the terms of degree of saturation and travel speed are analyzed using a simplified four-step model using CUBE software. The results show that in 2023, assuming 50% occupancy of the industrial park, the average travel speed decreases by 8.5% and the average degree of saturation increases by 18.7%. While in 2030, assuming 100% occupancy, the road performance is worsened, the average travel speed decreases by 46.4% and the average degree of saturation increases by 45.5%. A new additional lane in each direction on Semarang-Demak main corridor is simulated to anticipate the full operational of Sayung Industrial Park in the future. The result shows an improvement on road performance.
AB - This study aims to analyze the impact of Sayung Industrial Park development to the surrounding road network. The study merely relies on available secondary data, including recent transport study in Semarang Raya, trip rate, and previous research related on industrial area occupancy growth. Road performance in the terms of degree of saturation and travel speed are analyzed using a simplified four-step model using CUBE software. The results show that in 2023, assuming 50% occupancy of the industrial park, the average travel speed decreases by 8.5% and the average degree of saturation increases by 18.7%. While in 2030, assuming 100% occupancy, the road performance is worsened, the average travel speed decreases by 46.4% and the average degree of saturation increases by 45.5%. A new additional lane in each direction on Semarang-Demak main corridor is simulated to anticipate the full operational of Sayung Industrial Park in the future. The result shows an improvement on road performance.
UR - http://www.scopus.com/inward/record.url?scp=85185818766&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/1294/1/012003
DO - 10.1088/1755-1315/1294/1/012003
M3 - Conference article
AN - SCOPUS:85185818766
SN - 1755-1307
VL - 1294
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
IS - 1
M1 - 012003
T2 - 4th International Symposium on Transportation Studies in Developing Countries, ISTSDC 2023
Y2 - 11 November 2023 through 12 November 2023
ER -