Risk-based Contract Management on the Design and Build Construction to Minimize Disputes in Infrastructure Projects

Kemala Hayati, Yusuf Latief, S. Achmad Jaka

Research output: Contribution to journalConference articlepeer-review

1 Citation (Scopus)

Abstract

A poor contract management is considered the main cause of disputes in construction contracts. While dispute in a project oftenly unavoidable, it is however can be minimized by applying a proper contract management which should be in line with the project's nature. A common understanding to the roles and intricacies of the contract will lead the involved parties in the project to be open to negotiate, hence produces a better construction contract in a balanced manner. This study aims to determine the management phases in the construction contracts in which incorporate the approach of input, process, output, risk and impact. All activities in every phases of the contract management will be identified for it influence to dispute. The findings will suggest a strategic management strategy that is manageble in minimizing dispute in construction industry.

Original languageEnglish
Article number012047
JournalIOP Conference Series: Materials Science and Engineering
Volume506
Issue number1
DOIs
Publication statusPublished - 15 Apr 2019
Event1st South Aceh International Conference on Engineering and Technology, SAICOET 2018 - Tapaktuan, Aceh Selatan, Indonesia
Duration: 8 Dec 20189 Dec 2018

Fingerprint

Dive into the research topics of 'Risk-based Contract Management on the Design and Build Construction to Minimize Disputes in Infrastructure Projects'. Together they form a unique fingerprint.

Cite this