T1 - Project Management Performance Evaluation of Medical Oxygen Generator
AU - Dachyar, M.
AU - Silalelo, Yudi Fernando
N1 - Publisher Copyright:
© 2023 IEEE.
PY - 2023
Y1 - 2023
N2 - The need for easier and more affordable access to oxygen is still an obstacle in some parts of Indonesia, especially in the eastern part of Indonesia. A medical oxygen generator device can answer the problems related to the difficulty of accessing oxygen. There are frequent delays in the completion of the medical oxygen generator project, causing cost overruns and delays in providing first aid. The purpose of this study is to measure the performance of companies project management and provide suggestions for improvement strategies so that companies can improve their project performance. In this study, data collection was carried out by recapitulating some of the estimated project cost data, followed by compiling standard budgets for each project. Based on these two data, the company's project management performance is evaluated using Earned Value method with the CR as the indicator. The goal is to find the best strategies to improve the company's project management performance based on our results. The proposed measurements provide the stages that have poor performance and then provide solutions for the company for each stage that have poor performance.
AB - The need for easier and more affordable access to oxygen is still an obstacle in some parts of Indonesia, especially in the eastern part of Indonesia. A medical oxygen generator device can answer the problems related to the difficulty of accessing oxygen. There are frequent delays in the completion of the medical oxygen generator project, causing cost overruns and delays in providing first aid. The purpose of this study is to measure the performance of companies project management and provide suggestions for improvement strategies so that companies can improve their project performance. In this study, data collection was carried out by recapitulating some of the estimated project cost data, followed by compiling standard budgets for each project. Based on these two data, the company's project management performance is evaluated using Earned Value method with the CR as the indicator. The goal is to find the best strategies to improve the company's project management performance based on our results. The proposed measurements provide the stages that have poor performance and then provide solutions for the company for each stage that have poor performance.
KW - Earned Value
KW - Performance Measurement
KW - Project Management
KW - PSA Oxygen Generator
KW - Time and Cost Control
UR - http://www.scopus.com/inward/record.url?scp=85163116079&partnerID=8YFLogxK
U2 - 10.1109/ICCoSITE57641.2023.10127737
DO - 10.1109/ICCoSITE57641.2023.10127737
M3 - Conference contribution
AN - SCOPUS:85163116079
T3 - ICCoSITE 2023 - International Conference on Computer Science, Information Technology and Engineering: Digital Transformation Strategy in Facing the VUCA and TUNA Era
SP - 217
EP - 221
BT - ICCoSITE 2023 - International Conference on Computer Science, Information Technology and Engineering
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2023 International Conference on Computer Science, Information Technology and Engineering, ICCoSITE 2023
Y2 - 16 February 2023
ER -