TY - JOUR
T1 - Optimizing maintenance of electrical components with BIM and web-based inputs to improve safety performance in government green building
AU - Dewi, S.
AU - Latief, Y.
AU - Machfudiyanto, R. A.
N1 - Funding Information:
The authors wish to thank and acknowledge Project Management Study Program, Faculty of Engineering, Universitas Indonesia, Indonesia, for generous support and encouragement of this research especially for the networking to green building colleague. We also thank to all the organizations and individuals who kindly participated in the research. Their time and input in the interview and survey are much appreciated.
Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2020/5/18
Y1 - 2020/5/18
N2 - A green building with proper maintenance will have higher energy efficiency and longer lifetime, as damages to building utilities can be minimised. One of the vital utilities are electrical components. Damages to electrical components may have fatal consequences such as short circuit or fire. This research aims to improve the maintenance of electrical components of green building. A case study is taken from a government green building for electrical components, in order to meet the building reliability requirements which consist of safety, health, comfort, and convenience. Maintenance system which is Work Breakdown Structure (WBS) level 4 of building maintenance integrated with information systems and Building Information Modeling (BIM) are influential factors for building maintenance performance. The research methods used are archival analysis, case study, survey, expert judgement, and statical analysis. This research generates product of web based information system integrated with BIM, and also mathematical model that enhance the maintenance performance of government green building for electrical components would become more effective and efficient especially for safety performance.
AB - A green building with proper maintenance will have higher energy efficiency and longer lifetime, as damages to building utilities can be minimised. One of the vital utilities are electrical components. Damages to electrical components may have fatal consequences such as short circuit or fire. This research aims to improve the maintenance of electrical components of green building. A case study is taken from a government green building for electrical components, in order to meet the building reliability requirements which consist of safety, health, comfort, and convenience. Maintenance system which is Work Breakdown Structure (WBS) level 4 of building maintenance integrated with information systems and Building Information Modeling (BIM) are influential factors for building maintenance performance. The research methods used are archival analysis, case study, survey, expert judgement, and statical analysis. This research generates product of web based information system integrated with BIM, and also mathematical model that enhance the maintenance performance of government green building for electrical components would become more effective and efficient especially for safety performance.
UR - http://www.scopus.com/inward/record.url?scp=85086266395&partnerID=8YFLogxK
U2 - 10.1088/1757-899X/830/2/022033
DO - 10.1088/1757-899X/830/2/022033
M3 - Conference article
AN - SCOPUS:85086266395
SN - 1757-8981
VL - 830
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
IS - 2
M1 - 022033
T2 - 3rd International Conference on Innovation in Engineering and Vocational Education 2019, ICIEVE 2019
Y2 - 26 November 2019
ER -