Optimization analysis for fault level reduction with inter-tie transformer in designing power plant balikpapan refinery project

Vika Prasetya Andika, Rinaldy Dalimi

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The electrical power system in existing Balikpapan Refinery is not possible to interconnect with new loads and New Power Plant. This scheme was limited by rating capacity and short circuit. In this paper has describes power system study of optimization in designing Balikpapan Refinery power plant system, through the interconnection between Existing, RDMP phase-I and RDMP phase-II with Single Power Island concept. The main problem to connecting all the power generators become single power island at 33 kV bus is resulting in short circuit rating in excess of 40 kA. In term of process design and constructability, three (3) scheme were purposed and evaluated. Selected scheme with 33 kV synchronization bus installed with the inter-tie transformer to split two groups has been analyzed to meet the minimum requirement of design criteria and power system study. Using ETAP Model with 3 (three) method of studies result that maximum short circuit has been reduced to 32.074 kA from 46.403 kA respectively. Also from this integration concept has been optimized the number of the spare generator from each island power plant become 1 (one) unit common spare generator, which lead to reducing CAPEX of overall Project RDMP phase-I and RDMP phase-II.

Original languageEnglish
Title of host publication2019 16th International Conference on Quality in Research, QIR 2019 - International Symposium on Electrical and Computer Engineering
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781728118987
DOIs
Publication statusPublished - Jul 2019
Event16th International Conference on Quality in Research, QIR 2019 - Padang, Indonesia
Duration: 22 Jul 201924 Jul 2019

Publication series

Name2019 16th International Conference on Quality in Research, QIR 2019 - International Symposium on Electrical and Computer Engineering

Conference

Conference16th International Conference on Quality in Research, QIR 2019
Country/TerritoryIndonesia
CityPadang
Period22/07/1924/07/19

Keywords

  • Bus Splitting
  • ETAP
  • Integration
  • Inter-Tie Transformer
  • RDMP
  • Short Circuit