Abstract
Mass rapid transit (MRT) is an efficient transportation mode that is urgently needed by a growing city such as Jakarta, Indonesia. However, limited research has attempted to evaluate the system's current performance through a comprehensive, unit-based calculation of the costs of MRT operation and maintenance. This research aimed to develop a system for calculating and comparing MRT operation and maintenance costs per kilometer per year. The cost model has three components, namely, capital, operation cost, and maintenance cost, which are, respectively, calculated based on their percentage toward total cost. The cost model calculation determined that Jakarta MRT operation and maintenance costs total USD 8.44 million per kilometer per year. This result was compared to other countries' MRT operations.
| Original language | English |
|---|---|
| Article number | 7645142 |
| Journal | Journal of Advanced Transportation |
| Volume | 2020 |
| DOIs | |
| Publication status | Published - 1 Jan 2020 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 11 Sustainable Cities and Communities
-
SDG 17 Partnerships for the Goals
Fingerprint
Dive into the research topics of 'Mass Rapid Transit Operation and Maintenance Cost Calculation Model'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver