TY - GEN
T1 - Improving Indonesian logistics performance with using six sigma, DMAIC and integration Process
AU - Sirajuddin,
AU - Zagloel, Teuku Yuri M.
AU - Rauf, Syarkawi
N1 - Publisher Copyright:
© IEOM Society International.
PY - 2016
Y1 - 2016
N2 - Indonesia is a maritime country that havingmuch potential marine natural resources. As a maritime country, that connected among islands, Indonesia needs to develop a national logistics management concept in order to make trading in goods and services more quickly, safely and smoothly. One becoming the focal point of the current government is the development of the sea toll or the development of infrastructure and service quality system of national port, so the distribution of goods and services from each region can be more efficiently and waiting time (dwelling time) can be dropped from 6-7 days to 3, 5-4 days, and the national logistics costs can decrease from 27% of GDP to 23% - 19% of GDP. Indonesia was concernedto improve the performance of quality of national logistics services. This is the reason why author interest to discusses in the Journal. The method that we usedto analyzing problems of dwelling time is the method of Six Sigma, DMAIC and process integration. With DMAIC method, six sigma and process integration, problems of dwelling time can be reduced to achieve the target be 3.4-4 days.
AB - Indonesia is a maritime country that havingmuch potential marine natural resources. As a maritime country, that connected among islands, Indonesia needs to develop a national logistics management concept in order to make trading in goods and services more quickly, safely and smoothly. One becoming the focal point of the current government is the development of the sea toll or the development of infrastructure and service quality system of national port, so the distribution of goods and services from each region can be more efficiently and waiting time (dwelling time) can be dropped from 6-7 days to 3, 5-4 days, and the national logistics costs can decrease from 27% of GDP to 23% - 19% of GDP. Indonesia was concernedto improve the performance of quality of national logistics services. This is the reason why author interest to discusses in the Journal. The method that we usedto analyzing problems of dwelling time is the method of Six Sigma, DMAIC and process integration. With DMAIC method, six sigma and process integration, problems of dwelling time can be reduced to achieve the target be 3.4-4 days.
KW - DMAIC
KW - Logistics
KW - Port performance
KW - Six sigma
UR - http://www.scopus.com/inward/record.url?scp=85018742577&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:85018742577
SN - 9780985549749
T3 - Proceedings of the International Conference on Industrial Engineering and Operations Management
SP - 2857
EP - 2858
BT - 6th International Conference on Industrial Engineering and Operations Management in Kuala Lumpur, IEOM 2016
PB - IEOM Society
T2 - 6th International Conference on Industrial Engineering and Operations Management in Kuala Lumpur, IEOM 2016
Y2 - 8 March 2016 through 10 March 2016
ER -