Implementation of Design and Build Contract in Government Building Construction Project Practice

Anggoro Putro, Yusuf Latief

Research output: Contribution to journalConference articlepeer-review

Abstract

The Development of government infrastructure projects, which has grown rapidly in recent years, require the Indonesian Government, through the Ministry of Public Work and Housing, to socialize the breakthrough of the national construction procurement system with design and build contract. This breakthrough on construction projects is expected to accelerate the achievement of government infrastructure targets, thus supporting national economic growth. The purpose of this research is to identify DB characteristics, implementation, the advantages and disadvantages in Indonesian construction projects, and to analyze the obstacles, conflicts and problems emerging on the construction project implementation. In the construction project implementation, all participants involved hopes that the project can be completed within the objectives. The expected objectives are that the project is completed in time, does not exceed the budget and meets the quality requirements.

Original languageEnglish
Article number012016
JournalIOP Conference Series: Materials Science and Engineering
Volume897
Issue number1
DOIs
Publication statusPublished - 5 Aug 2020
Event2020 5th International Conference on Civil Engineering and Materials Science, ICCEMS 2020 - Singapore, Virtual, Singapore
Duration: 15 May 202018 May 2020