TY - GEN
T1 - Identification Risk Potential Hazard of Railway Project Based on the Work Breakdown Structure to Improve Safety Performance
AU - Aryanto, D. V.
AU - Riantini, L. S.
AU - Machfudiyanto, R. A.
AU - Latief, Y.
N1 - Publisher Copyright:
© 2023, The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
PY - 2023
Y1 - 2023
N2 - Railway construction work is carried out in developing or developed countries around the world. The railway was built as a means of mass transportation to support connectivity between places. Railway construction work is one of the complex construction projects. Construction accidents can hamper many work activities. It is not uncommon for construction accidents to occur in construction that affects people, property, public safety, and the environment. For this reason, it is necessary to identify and analyze the risk of hazards from the beginning to prevent the occurrence of these construction accidents. This study aims to identify the potential hazards in each work package by reviewing work methods, work activities, and WBS-based resources for standardized railway construction using a qualitative approach. This re-search is expected to produce safety risk sources with the highest potential hazards in the railway construction works. The risk of construction accidents can be reduced or even zero risks of construction accidents (zero accident) during construction project activities.
AB - Railway construction work is carried out in developing or developed countries around the world. The railway was built as a means of mass transportation to support connectivity between places. Railway construction work is one of the complex construction projects. Construction accidents can hamper many work activities. It is not uncommon for construction accidents to occur in construction that affects people, property, public safety, and the environment. For this reason, it is necessary to identify and analyze the risk of hazards from the beginning to prevent the occurrence of these construction accidents. This study aims to identify the potential hazards in each work package by reviewing work methods, work activities, and WBS-based resources for standardized railway construction using a qualitative approach. This re-search is expected to produce safety risk sources with the highest potential hazards in the railway construction works. The risk of construction accidents can be reduced or even zero risks of construction accidents (zero accident) during construction project activities.
KW - Railway
KW - Risk
KW - Safety performance
KW - Work breakdown structure
UR - http://www.scopus.com/inward/record.url?scp=85137754650&partnerID=8YFLogxK
U2 - 10.1007/978-981-16-9348-9_56
DO - 10.1007/978-981-16-9348-9_56
M3 - Conference contribution
AN - SCOPUS:85137754650
SN - 9789811693472
T3 - Lecture Notes in Civil Engineering
SP - 641
EP - 650
BT - Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering - ICRMCE 2021
A2 - Kristiawan, Stefanus Adi
A2 - Gan, Buntara S.
A2 - Shahin, Mohamed
A2 - Sharma, Akanshu
PB - Springer Science and Business Media Deutschland GmbH
T2 - 5th International Conference on Rehabilitation and Maintenance in Civil Engineering, ICRMCE 2021
Y2 - 8 July 2021 through 9 July 2021
ER -