Identification Risk Potential Hazard of Railway Project Based on the Work Breakdown Structure to Improve Safety Performance

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Railway construction work is carried out in developing or developed countries around the world. The railway was built as a means of mass transportation to support connectivity between places. Railway construction work is one of the complex construction projects. Construction accidents can hamper many work activities. It is not uncommon for construction accidents to occur in construction that affects people, property, public safety, and the environment. For this reason, it is necessary to identify and analyze the risk of hazards from the beginning to prevent the occurrence of these construction accidents. This study aims to identify the potential hazards in each work package by reviewing work methods, work activities, and WBS-based resources for standardized railway construction using a qualitative approach. This re-search is expected to produce safety risk sources with the highest potential hazards in the railway construction works. The risk of construction accidents can be reduced or even zero risks of construction accidents (zero accident) during construction project activities.

Original languageEnglish
Title of host publicationProceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering - ICRMCE 2021
EditorsStefanus Adi Kristiawan, Buntara S. Gan, Mohamed Shahin, Akanshu Sharma
PublisherSpringer Science and Business Media Deutschland GmbH
Pages641-650
Number of pages10
ISBN (Print)9789811693472
DOIs
Publication statusPublished - 2023
Event5th International Conference on Rehabilitation and Maintenance in Civil Engineering, ICRMCE 2021 - Virtual, Online
Duration: 8 Jul 20219 Jul 2021

Publication series

NameLecture Notes in Civil Engineering
Volume225
ISSN (Print)2366-2557
ISSN (Electronic)2366-2565

Conference

Conference5th International Conference on Rehabilitation and Maintenance in Civil Engineering, ICRMCE 2021
CityVirtual, Online
Period8/07/219/07/21

Keywords

  • Railway
  • Risk
  • Safety performance
  • Work breakdown structure

Fingerprint

Dive into the research topics of 'Identification Risk Potential Hazard of Railway Project Based on the Work Breakdown Structure to Improve Safety Performance'. Together they form a unique fingerprint.

Cite this