TY - GEN
T1 - Identification of roof truss work activities for the Jakarta international stadium project with heavy lifting construction method using strand jack system
AU - Sejati, Pria Akbar
AU - Isvara, Wisnu
AU - Latief, Yusuf
N1 - Publisher Copyright:
© 2023 Author(s).
PY - 2023/5/8
Y1 - 2023/5/8
N2 - The Jakarta government is building an international standard stadium. The roof construction is designed using a space frame system. The construction method used is heavy lifting using a strand jack system and is one of the heaviest lifting loads in the world. Therefore, in planning its implementation, it is necessary to identify the stages of its activities to minimize construction errors. This study aims to identify roofing work activities on the Jakarta International Stadium project. This research is divided into two main stages, namely expert judgment and respondents survey. A total of 7 experts and 30 respondents who were involved in the construction were asked for their opinions in identifying these activities. Based on the results of the analysis, 17 roofing work activities were identified. These activities are design, procurement, fabrication, delivery, anchor installation, lifting frame installation, temporary support installation, assembling segment of truss, joining the segment, space frame assembly & installation, cable installation, lifting process using strand jack, joining the main truss using infilling segment, remaining truss & space frame installation, purlin installation, installation of a retractable roof and finishing. These activities are useful for developing work breakdown structures, planning schedules, quality, safety, etc.
AB - The Jakarta government is building an international standard stadium. The roof construction is designed using a space frame system. The construction method used is heavy lifting using a strand jack system and is one of the heaviest lifting loads in the world. Therefore, in planning its implementation, it is necessary to identify the stages of its activities to minimize construction errors. This study aims to identify roofing work activities on the Jakarta International Stadium project. This research is divided into two main stages, namely expert judgment and respondents survey. A total of 7 experts and 30 respondents who were involved in the construction were asked for their opinions in identifying these activities. Based on the results of the analysis, 17 roofing work activities were identified. These activities are design, procurement, fabrication, delivery, anchor installation, lifting frame installation, temporary support installation, assembling segment of truss, joining the segment, space frame assembly & installation, cable installation, lifting process using strand jack, joining the main truss using infilling segment, remaining truss & space frame installation, purlin installation, installation of a retractable roof and finishing. These activities are useful for developing work breakdown structures, planning schedules, quality, safety, etc.
UR - http://www.scopus.com/inward/record.url?scp=85160077728&partnerID=8YFLogxK
U2 - 10.1063/5.0121463
DO - 10.1063/5.0121463
M3 - Conference contribution
AN - SCOPUS:85160077728
T3 - AIP Conference Proceedings
BT - 3rd Borobudur International Symposium on Science and Technology 2021
A2 - Setiyo, Muji
A2 - Pambuko, Zulfikar Bagus
A2 - Praja, Chrisna Bagus Edhita
A2 - Setiawan, Agus
A2 - Dewi, Veni Soraya
A2 - Yuliastuti, Fitriana
A2 - Muliawanti, Lintang
PB - American Institute of Physics Inc.
T2 - 3rd Borobudur International Symposium on Science and Technology 2021
Y2 - 15 December 2021
ER -