Feasibility study of the Kerinci 350 MW hydro power plant
M. Muaz Afra Yunardi,
Budi Sudiarto
Department of Electrical Engineering
Research output
:
Contribution to journal
›
Article
›
peer-review
Overview
Fingerprint
Fingerprint
Dive into the research topics of 'Feasibility study of the Kerinci 350 MW hydro power plant'. Together they form a unique fingerprint.
Sort by
Weight
Alphabetically
Keyphrases
Kerinci
100%
Hydropower Plant
100%
Cost-benefit
40%
Electric Power
40%
River Flow
40%
Batangas
40%
Maintenance Cost
20%
Operating Cost
20%
Renewable Energy
20%
Internal Rate of Return
20%
Net Present Value
20%
Electrical Energy
20%
Government Policy
20%
Hydropower Development
20%
Cash Flow
20%
Ratio Analysis
20%
Potential Utilization
20%
Economic Conditions
20%
Renewable Energy Consumption
20%
Return on Equity
20%
Power Potential
20%
Depreciation
20%
Demand for Electricity
20%
Energy Produced
20%
Initial Investment Cost
20%
Revenue Expenditure
20%
Inflation Tax
20%
During Construction
20%
Cost Inflation
20%
Engineering
Feasibility Study
100%
Hydro Power
100%
Hydropower Plant
100%
Hydroelectric Energy
66%
River Flow
66%
Energy Engineering
33%
Renewable Energy Source
33%
Net Present Value
33%
Internal Rate of Return
33%
Cash Flow
33%
Electrical Power
33%
Operating Cost
33%
Initial Investment Cost
33%