TY - GEN
T1 - Evaluation of Scrum Practice Maturity in Software Development of Mobile Communication Application
AU - Ayunda, Pramitya Lisnawaty
AU - Budiardjo, Eko K.
N1 - Funding Information:
This research was supported by research grant NKB-865/UN2.RST/HKP.05.00/2020 from Universitas Indonesia. We would like to express our gratitude to the Faculty of Computer Science, Universitas Indonesia. This research was also supported by Aldo Kelvianto Wachyudi in this case study research.
Publisher Copyright:
© 2020 IEEE.
Copyright:
Copyright 2020 Elsevier B.V., All rights reserved.
PY - 2020/9/15
Y1 - 2020/9/15
N2 - Focusing on the big topic of information technology related to software engineering, Scrum is one of the frameworks on the agile methodology to develop innovative products and services. Implementing the Scrum framework can be challenging. Changes in teamwork culture, both vertically and horizontally in a software development organization, cannot be avoided. In software development process improvement, evaluation of the scrum implementation using the Scrum Maturity Model. Scrum Maturity Model also assesses the extent of the implementation of the scrum such as the implementation of roles, events, and artifacts following the Scrum Guide. This research occurred to the representative of the product owner, scrum master, and development team. There are seven sub-categories which do not implement the best scrum practices. These practices have an impact on the avoided risk. By understanding the impact of these risks, the team can make plans to avoid those risks. The sub-categories are the product owner, development team, sprint, sprint planning, daily Scrum, product backlog, and sprint backlog.
AB - Focusing on the big topic of information technology related to software engineering, Scrum is one of the frameworks on the agile methodology to develop innovative products and services. Implementing the Scrum framework can be challenging. Changes in teamwork culture, both vertically and horizontally in a software development organization, cannot be avoided. In software development process improvement, evaluation of the scrum implementation using the Scrum Maturity Model. Scrum Maturity Model also assesses the extent of the implementation of the scrum such as the implementation of roles, events, and artifacts following the Scrum Guide. This research occurred to the representative of the product owner, scrum master, and development team. There are seven sub-categories which do not implement the best scrum practices. These practices have an impact on the avoided risk. By understanding the impact of these risks, the team can make plans to avoid those risks. The sub-categories are the product owner, development team, sprint, sprint planning, daily Scrum, product backlog, and sprint backlog.
KW - agile methodology
KW - scrum maturity assessment
KW - software development
UR - http://www.scopus.com/inward/record.url?scp=85098978394&partnerID=8YFLogxK
U2 - 10.1109/IC2IE50715.2020.9274625
DO - 10.1109/IC2IE50715.2020.9274625
M3 - Conference contribution
AN - SCOPUS:85098978394
T3 - 2020 3rd International Conference on Computer and Informatics Engineering, IC2IE 2020
SP - 317
EP - 322
BT - 2020 3rd International Conference on Computer and Informatics Engineering, IC2IE 2020
A2 - Hermawan, Indra
A2 - Rasyidin, Muhammad Yusuf Bagus
A2 - Huzaifa, Malisa
A2 - Ermis Ismail, Iklima
A2 - Muharram, Asep Taufik
A2 - Mardiyono, Anggi
A2 - Marcheeta, Noorlela
A2 - Kurniawati, Dewi
A2 - Yuly, Ade Rahma
A2 - Suhanda, Ariawan Andi
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 3rd International Conference on Computer and Informatics Engineering, IC2IE 2020
Y2 - 15 September 2020 through 16 September 2020
ER -