T1 - Evaluation of maintenance performance measurement using six sigma maintenance scorecard method (case study at PLTM XYZ)
AU - Muslim, Erlinda
AU - Widyawati, Nabila
AU - Putri, Maylani Ratna
N1 - Publisher Copyright:
© 2024 Author(s).
PY - 2024/2/6
Y1 - 2024/2/6
N2 - Maintenance is the most essential factor for every industry in order to optimally operate the work and minimize maintenance costs. This research was conducted in the Operation & Maintenance (O & M) department of PLTM XYZ using the Six Sigma Maintenance Scorecard which aims to measure the level of achievement of comprehensive maintenance performance by transforming the company's goals. The Six Sigma Maintenance Scorecard uses the European Standard Maintenance Key Performance Indicators as a performance measurement indicator, which considers three perspectives; economic, technical, and organizational. There are 17 indicators relevant to PLTM XYZ, consisting of 6 economic indicators, 9 technical indicators, and 2 organizational indicators. The weighting of each indicator is carried out by using the Analytical Hierarchy Process (AHP) as an input for the Pn attribute in determining the sigma level. Afterwards, the calculation of the Six Sigma Maintenance Scorecard resulted in a sigma level value of 3.38 which shows that the maintenance performance at PLTM XYZ has a process capability of around 96,75%, which could be categorized in the average industry performance generally, therefore improvements are still needed. Furthermore, there are some indicators that need to be analyzed in terms of providing appropriate improvement suggestions to reach 6σ level.
AB - Maintenance is the most essential factor for every industry in order to optimally operate the work and minimize maintenance costs. This research was conducted in the Operation & Maintenance (O & M) department of PLTM XYZ using the Six Sigma Maintenance Scorecard which aims to measure the level of achievement of comprehensive maintenance performance by transforming the company's goals. The Six Sigma Maintenance Scorecard uses the European Standard Maintenance Key Performance Indicators as a performance measurement indicator, which considers three perspectives; economic, technical, and organizational. There are 17 indicators relevant to PLTM XYZ, consisting of 6 economic indicators, 9 technical indicators, and 2 organizational indicators. The weighting of each indicator is carried out by using the Analytical Hierarchy Process (AHP) as an input for the Pn attribute in determining the sigma level. Afterwards, the calculation of the Six Sigma Maintenance Scorecard resulted in a sigma level value of 3.38 which shows that the maintenance performance at PLTM XYZ has a process capability of around 96,75%, which could be categorized in the average industry performance generally, therefore improvements are still needed. Furthermore, there are some indicators that need to be analyzed in terms of providing appropriate improvement suggestions to reach 6σ level.
KW - 6? level
KW - Analytical Hierarchy Process (AHP)
KW - Maintenance
KW - Maintenance Key Performance Indicator (KPIs)
KW - Maintenance Scorecard
KW - Six Sigma Maintenance Scorecard
UR - http://www.scopus.com/inward/record.url?scp=85185774115&partnerID=8YFLogxK
U2 - 10.1063/5.0144169
DO - 10.1063/5.0144169
M3 - Conference contribution
AN - SCOPUS:85185774115
T3 - AIP Conference Proceedings
BT - AIP Conference Proceedings
A2 - Kusuma, Andyka
A2 - Fatriansyah, Jaka Fajar
A2 - Dhelika, Radon
A2 - Pratama, Mochamad Adhiraga
A2 - Irwansyah, Ridho
A2 - Maknun, Imam Jauhari
A2 - Putra, Wahyuaji Narottama
A2 - Ardi, Romadhani
A2 - Harwahyu, Ruki
A2 - Harahap, Yulia Nurliani
A2 - Lischer, Kenny
PB - American Institute of Physics Inc.
T2 - 17th International Conference on Quality in Research, QiR 2021 in conjunction with the International Tropical Renewable Energy Conference 2021, I-Trec 2021 and the 2nd AUN-SCUD International Conference, CAIC-SIUD
Y2 - 13 October 2021 through 15 October 2021
ER -