@inproceedings{63573dcaede54369b4ce790f66b8a428,
title = "Evaluation design and build contract system in mixed used building project based on standard contract management body of knowledge",
abstract = "In order to expedite preparation and tender process, design and build contract is used for Mixed Use Building Project. In practice, many claims are raised by contractors, causing dispute among related stakeholders that should be minimized by proper contract management. This study aims to find out the right construction and design construction contract management strategy in the Mixed Use Building project based on Contract Management Body of Knowledge by conducting surveys and interviewing experts. This study obtained a contract management for design and build which is risk based.",
keywords = "CMBOK, Claim, Contract management, Design and build, Dispute, Mixed use building project",
author = "Thamrin, {Evelyn Monica} and Yusuf Latief",
note = "Publisher Copyright: {\textcopyright} IEOM Society International.; 8th International Conference on Industrial Engineering and Operations Management, IEOM 2018 ; Conference date: 06-03-2018 Through 08-03-2018",
year = "2018",
language = "English",
isbn = "9781532359446",
series = "Proceedings of the International Conference on Industrial Engineering and Operations Management",
publisher = "IEOM Society",
pages = "2564--2569",
booktitle = "Proceedings of the International Conference on Industrial Engineering and Operations Management, IEOM 2018",
}