Evaluation design and build contract system in mixed used building project based on standard contract management body of knowledge

Evelyn Monica Thamrin, Yusuf Latief

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

In order to expedite preparation and tender process, design and build contract is used for Mixed Use Building Project. In practice, many claims are raised by contractors, causing dispute among related stakeholders that should be minimized by proper contract management. This study aims to find out the right construction and design construction contract management strategy in the Mixed Use Building project based on Contract Management Body of Knowledge by conducting surveys and interviewing experts. This study obtained a contract management for design and build which is risk based.

Original languageEnglish
Title of host publicationProceedings of the International Conference on Industrial Engineering and Operations Management, IEOM 2018
PublisherIEOM Society
Pages2564-2569
Number of pages6
ISBN (Print)9781532359446
Publication statusPublished - 2018
Event8th International Conference on Industrial Engineering and Operations Management, IEOM 2018 - Bandung, Indonesia
Duration: 6 Mar 20188 Mar 2018

Publication series

NameProceedings of the International Conference on Industrial Engineering and Operations Management
Volume2018-March
ISSN (Electronic)2169-8767

Conference

Conference8th International Conference on Industrial Engineering and Operations Management, IEOM 2018
Country/TerritoryIndonesia
CityBandung
Period6/03/188/03/18

Keywords

  • CMBOK
  • Claim
  • Contract management
  • Design and build
  • Dispute
  • Mixed use building project

Fingerprint

Dive into the research topics of 'Evaluation design and build contract system in mixed used building project based on standard contract management body of knowledge'. Together they form a unique fingerprint.

Cite this