TY - JOUR
T1 - Enhancing Risk Assessment in Toll Road Operations
T2 - A Hybrid Rough Delphi-Rough DEMATEL Approach
AU - Pratama, G. Ardi
AU - Latief, Y.
AU - Trigunarsyah, Bambang
AU - Riantini, L. Sagita
AU - Sihombing, Lukas Beladi
N1 - Publisher Copyright:
© 2023 by the authors.
PY - 2023/9
Y1 - 2023/9
N2 - This study aims to identify significant risks and their relationship to the successful operation of the Trans-Sumatra toll road in Indonesia. The research utilizes the Delphi and DEMATEL methods, along with rough set analysis, to identify and evaluate 28 risks associated with toll road operations in Sumatra. The research identifies 13 dominant risks, including policy changes, government intervention, inflation, financial distress, fluctuation of interest rate, fluctuation of currency, high cost of maintenance, low volume of traffic, competitive routes, overloading vehicles, many infrastructure defects, and natural disasters. In this case, natural disasters, inflation, and vehicles with excessive loads are the most dominant cause factors because those risks have the highest cause value based on the cause-effect diagram. Furthermore, the prominence diagram reveals that income risk, policy changes, and financial distress have notable implications for operational activities. The study presents a MCDM risk assessment approach that incorporates rough set analysis, providing a comprehensive understanding of the critical risk relationship factors for toll road operations. By integrating rough set analysis, this research contributes to the field of toll road operations and risk assessment. The identified risks and their relationships serve as a foundation for developing effective strategies for toll road operational management.
AB - This study aims to identify significant risks and their relationship to the successful operation of the Trans-Sumatra toll road in Indonesia. The research utilizes the Delphi and DEMATEL methods, along with rough set analysis, to identify and evaluate 28 risks associated with toll road operations in Sumatra. The research identifies 13 dominant risks, including policy changes, government intervention, inflation, financial distress, fluctuation of interest rate, fluctuation of currency, high cost of maintenance, low volume of traffic, competitive routes, overloading vehicles, many infrastructure defects, and natural disasters. In this case, natural disasters, inflation, and vehicles with excessive loads are the most dominant cause factors because those risks have the highest cause value based on the cause-effect diagram. Furthermore, the prominence diagram reveals that income risk, policy changes, and financial distress have notable implications for operational activities. The study presents a MCDM risk assessment approach that incorporates rough set analysis, providing a comprehensive understanding of the critical risk relationship factors for toll road operations. By integrating rough set analysis, this research contributes to the field of toll road operations and risk assessment. The identified risks and their relationships serve as a foundation for developing effective strategies for toll road operational management.
KW - Delphi
KW - DEMATEL
KW - MCDM
KW - Risks
KW - Rough Set
KW - Toll Road Operations
UR - http://www.scopus.com/inward/record.url?scp=85174229003&partnerID=8YFLogxK
U2 - 10.28991/CEJ-2023-09-09-03
DO - 10.28991/CEJ-2023-09-09-03
M3 - Article
AN - SCOPUS:85174229003
SN - 2676-6957
VL - 9
SP - 2130
EP - 2144
JO - Civil Engineering Journal (Iran)
JF - Civil Engineering Journal (Iran)
IS - 9
ER -