Effectiveness of Quality Control Circle on Construction Company Performance in Indonesia

Rahmat Nurcahyo, Ofila Irhamna, M. Dachyar, Ramdha Dien

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

Quality is a crucial aspect which has to be concerned by organization to win the competition and gain success, including a construction industry. Furthermore, poor implementation of quality management policy and limited participation from employee will negatively impact the management of the project and competitiveness of the company. Decresing not only the success potential but also the survival potential of construction company within the industry. Performance achievement be better if the company supports the implementation of integrated quality management. Quality Control Circle (QCC) has been found to be a simple and productive technique of Total Quality Management (TQM) and is proposed to be applicable in construction companies. This study aims to determine the effect of quality control group objectives on the performance of construction companies in Indonesia. Regression was conducted to analyze the effect of the relationship between the objectives of the quality control group on the performance of the construction company with software SPSS 22. Based on the data analysis obtained from the survey, it was concluded that the objective of the quality control circle influenced the performance variable of construction companies in Indonesia by 61%.

Original languageEnglish
Title of host publication2018 IEEE 5th International Conference on Engineering Technologies and Applied Sciences, ICETAS 2018
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781538679661
DOIs
Publication statusPublished - 28 Jan 2019
Event5th IEEE International Conference on Engineering Technologies and Applied Sciences, ICETAS 2018 - Bangkok, Thailand
Duration: 22 Nov 201823 Nov 2018

Publication series

Name2018 IEEE 5th International Conference on Engineering Technologies and Applied Sciences, ICETAS 2018

Conference

Conference5th IEEE International Conference on Engineering Technologies and Applied Sciences, ICETAS 2018
CountryThailand
CityBangkok
Period22/11/1823/11/18

Keywords

  • construction industry
  • performance
  • quality control circle
  • regression analysis

Fingerprint Dive into the research topics of 'Effectiveness of Quality Control Circle on Construction Company Performance in Indonesia <sup>∗</sup>'. Together they form a unique fingerprint.

Cite this