N2 - Gintung Dam is a dam resulting from the post-disaster reconstruction and rehabilitation in 2009. In this study, economic feasibility analysis post reconstruction and rehabilitation is carried out. The feasibility analysis is reviewed based on economic value of the benefits of Gintung Dam and investment cost as well as Operational and Maintenance (O&M) costs. Economic valuation, which is an attempt to provide quantitative value to the goods and services produced by natural resources and the environment, is carried out for the benefits of dam. The method used is the investment criteria method which uses NPV, BCR, PBP, and IRR as parameters in determining the feasibility of project. Based on the results, for Gintung Dam with its function as a flood control was obtained NPV = Rp.14,023,230,130.29, BCR = 1.88, PBP = 27 years, and IRR = 12% and as groundwater conservation was obtained, NPV = Rp. 87,704,518,835.06, BCR = 6.51, PBP = 2.7 years, and IRR = 46.25%. The results of the analysis shows that the Gintung Dam reconstruction and rehabilitation project is economically feasible with the value results NPV > 0, BCR > 1, PBP < project life span (100 years), and IRR > interest rate used (10%).
AB - Gintung Dam is a dam resulting from the post-disaster reconstruction and rehabilitation in 2009. In this study, economic feasibility analysis post reconstruction and rehabilitation is carried out. The feasibility analysis is reviewed based on economic value of the benefits of Gintung Dam and investment cost as well as Operational and Maintenance (O&M) costs. Economic valuation, which is an attempt to provide quantitative value to the goods and services produced by natural resources and the environment, is carried out for the benefits of dam. The method used is the investment criteria method which uses NPV, BCR, PBP, and IRR as parameters in determining the feasibility of project. Based on the results, for Gintung Dam with its function as a flood control was obtained NPV = Rp.14,023,230,130.29, BCR = 1.88, PBP = 27 years, and IRR = 12% and as groundwater conservation was obtained, NPV = Rp. 87,704,518,835.06, BCR = 6.51, PBP = 2.7 years, and IRR = 46.25%. The results of the analysis shows that the Gintung Dam reconstruction and rehabilitation project is economically feasible with the value results NPV > 0, BCR > 1, PBP < project life span (100 years), and IRR > interest rate used (10%).
UR - http://www.scopus.com/inward/record.url?scp=85097542554&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/599/1/012053
DO - 10.1088/1755-1315/599/1/012053
M3 - Conference article
AN - SCOPUS:85097542554
SN - 1755-1307
VL - 599
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
IS - 1
M1 - 012053
T2 - 2nd International Conference on Green Energy and Environment, ICoGEE 2020
Y2 - 8 October 2020
ER -