TY - GEN
T1 - Economic analysis of renewable energy power plant in Sumatra, Indonesia
AU - Siregar, Boanerges Desryanto
AU - Sudiarto, Budi
AU - Setiabudy, Rudy
N1 - Publisher Copyright:
© 2019 IEEE.
PY - 2019/6
Y1 - 2019/6
N2 - With the increase of Indonesian economy every year, it causes an increase in electricity consumption. Increased use of electricity, must be balanced with the growth of electricity generation. Indonesia is a country that has enormous renewable energy potential, but has not been utilized optimally for electricity generation, so the opportunity to invest in renewable energy in Indonesia is still wide open. To increase the interest of investors the government has issued regulations regarding the selling price of electricity based on the type and location of the power plant. In this paper, we will calculate the payback period of each type of renewable energy power plant in each province on Sumatra Island. Calculations were performed assuming a rate of 10%/year for 7 years, a loan of 70% of the total investment and a capacity of 1 MW for all types of plants. Based on the calculation, the results show that Bangka Belitung is the province with the fastest payback period of each type of power plant. The highest selling price of electricity is IDR 2,077 and the lowest is IDR 1,025. Types of power plants with the most rapid payback period derived from geothermal energy are 3 years. As for the longest payback period derived from biomass power plants is 15.6 years.
AB - With the increase of Indonesian economy every year, it causes an increase in electricity consumption. Increased use of electricity, must be balanced with the growth of electricity generation. Indonesia is a country that has enormous renewable energy potential, but has not been utilized optimally for electricity generation, so the opportunity to invest in renewable energy in Indonesia is still wide open. To increase the interest of investors the government has issued regulations regarding the selling price of electricity based on the type and location of the power plant. In this paper, we will calculate the payback period of each type of renewable energy power plant in each province on Sumatra Island. Calculations were performed assuming a rate of 10%/year for 7 years, a loan of 70% of the total investment and a capacity of 1 MW for all types of plants. Based on the calculation, the results show that Bangka Belitung is the province with the fastest payback period of each type of power plant. The highest selling price of electricity is IDR 2,077 and the lowest is IDR 1,025. Types of power plants with the most rapid payback period derived from geothermal energy are 3 years. As for the longest payback period derived from biomass power plants is 15.6 years.
KW - Cost of electricity
KW - Payback period
KW - Renewable energy
UR - http://www.scopus.com/inward/record.url?scp=85084551925&partnerID=8YFLogxK
U2 - 10.1109/ICIRD47319.2019.9074768
DO - 10.1109/ICIRD47319.2019.9074768
M3 - Conference contribution
AN - SCOPUS:85084551925
T3 - 2nd IEEE International Conference on Innovative Research and Development, ICIRD 2019
BT - 2nd IEEE International Conference on Innovative Research and Development, ICIRD 2019
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2nd IEEE International Conference on Innovative Research and Development, ICIRD 2019
Y2 - 28 June 2019 through 30 June 2019
ER -