Dominant factors of change control system in the warehouse project based on BIM 5D

Sarah Salsabila Fitri Indriani, Yusuf Latief

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

A building project will inevitably change. Project delays are a phenomenon brought on by changes that are not followed by effective management. These issues include delays in work progress claims and payment of terms. The Nestle warehouse project utilized as a case study does not include BIM 5D technology in its change control system. This project was unable to keep up with the significant changes that took place since a strong management structure wasn't in place, and the newest technology wasn't yet incorporated. As a result, delays ultimately occurred. This study intends to examine the key elements of BIM 5D technology that can enhance change management processes and accelerate project completion. The 85 respondents who were engaged in the project's change control process, including engineers, BIM engineers, quantity surveyors, and estimators, were given questionnaires as part of the quantitative study. Using PLS-SEM, the data collected was examined (Partial Least Square - Structural Equation Model). The outcome of this study shows that real-time modeling from BIM 5D and quantity extraction are the key elements that may significantly enhance every step of a change control system. Because the BIM 5D technology uses automatic computation, contractors can keep up with the most recent modifications faster than by utilizing manual calculation. It will shorten the time required for the calculation of the quantity, the progress claim procedure, and overall project performance.

Original languageEnglish
Title of host publicationAIP Conference Proceedings
EditorsNaufal Ishartono, Yasir Sidiq
PublisherAmerican Institute of Physics Inc.
Edition1
ISBN (Electronic)9780735447820
DOIs
Publication statusPublished - 17 Jan 2024
Event7th Progressive and Fun Education International Conference 2022, Profunedu 2022 - Sorong, Indonesia
Duration: 8 Sept 2022 → …

Publication series

NameAIP Conference Proceedings
Number1
Volume2926
ISSN (Print)0094-243X
ISSN (Electronic)1551-7616

Conference

Conference7th Progressive and Fun Education International Conference 2022, Profunedu 2022
Country/TerritoryIndonesia
CitySorong
Period8/09/22 → …

Keywords

  • BIM 5D
  • building information modeling
  • change control
  • time performance
  • warehouse project

Fingerprint

Dive into the research topics of 'Dominant factors of change control system in the warehouse project based on BIM 5D'. Together they form a unique fingerprint.

Cite this