T1 - Development of Work Breakdown Structure (WBS) Standard for Producing the Risk Based Structural Work Safety Plan of Building
AU - Elsye, Vania
AU - Latief, Yusuf
AU - Sagita, Leni
N1 - Publisher Copyright:
© The Authors, published by EDP Sciences, 2018.
PY - 2018/1/22
Y1 - 2018/1/22
N2 - A construction project is inseparable from a series of tasks in the form of activities. Activities that take place on a project can be disrupted due to various reasons, one of the causes of the disruption of project activities are accidents on construction projects. The risk of workplace accidents can be prevented with early identification and analysis of the potential danger that exist in every activity contained in the project's WBS. The need for a standardized WBS in preventing the risk of workplace accidents is very important because it would present a risk assessment, impact and frequency arising from workplace accidents. The aim of this study is to develop a risk-based WBS standard particularly for structural work, by using a qualitative approach. The results of this research are WBS standard for building, source of potentially dangerous risk at structural work, and the development of safety plan using a risk-based WBS that has been standardized, as a form of prevention, reduction or even nullify the risk of workplace accidents (to obtain zero accidents) during construction project implementation.
AB - A construction project is inseparable from a series of tasks in the form of activities. Activities that take place on a project can be disrupted due to various reasons, one of the causes of the disruption of project activities are accidents on construction projects. The risk of workplace accidents can be prevented with early identification and analysis of the potential danger that exist in every activity contained in the project's WBS. The need for a standardized WBS in preventing the risk of workplace accidents is very important because it would present a risk assessment, impact and frequency arising from workplace accidents. The aim of this study is to develop a risk-based WBS standard particularly for structural work, by using a qualitative approach. The results of this research are WBS standard for building, source of potentially dangerous risk at structural work, and the development of safety plan using a risk-based WBS that has been standardized, as a form of prevention, reduction or even nullify the risk of workplace accidents (to obtain zero accidents) during construction project implementation.
UR - http://www.scopus.com/inward/record.url?scp=85041647952&partnerID=8YFLogxK
U2 - 10.1051/matecconf/201814706003
DO - 10.1051/matecconf/201814706003
M3 - Conference article
AN - SCOPUS:85041647952
VL - 147
JO - MATEC Web of Conferences
JF - MATEC Web of Conferences
SN - 2261-236X
M1 - 06003
T2 - 3rd International Conference on Sustainable Infrastructure and Built Environment, SIBE 2017
Y2 - 26 September 2017 through 27 September 2017
ER -