Abstract
In the construction project plan, a description of the project work that will be used as a reference for the implementation of the construction project is required. In fact, there are many construction projects, especially road projects that are not in accordance with the plan in terms of time and cost. For that, we need WBS (Work Breakdown Structure) and its dictionary as a project implementation reference in order to define project activities to the resources. The development of these documents will be discussed in this research so that the implementation of the project is expected to be in accordance with the plan. The results of this study describe the details of the road construction projects to their resources in the form of WBS (Work Breakdown Structure) dictionary.
Original language | English |
---|---|
Article number | 012007 |
Journal | IOP Conference Series: Earth and Environmental Science |
Volume | 195 |
Issue number | 1 |
DOIs | |
Publication status | Published - 14 Dec 2018 |
Event | 2nd International Conference on Eco Engineering Development 2018, ICEED 2018 - Tangerang, Indonesia Duration: 5 Sept 2018 → 6 Sept 2018 |
Keywords
- WBS
- WBS dictionary
- project planning
- road construction works