Development of work breakdown structure standard for safety planning on stadium construction work based on risk

Amelia Anggraini, Yusuf Latief

Research output: Contribution to journalConference articlepeer-review

1 Citation (Scopus)

Abstract

Purpose: The purpose of this study is to reduce the level of work accidents in stadium construction by developing risk-based work breakdown structures. Methodology: The research methodology includes several stages, namely the literature study, analysis of data archives and previously related project and research, as well as through the validation of experts. Result: The results of this study are WBS standards, implementation methods, activities, resources, potential hazard risks and safety planning using risk-based WBS standards on stadium construction work, as a method in preventing, reducing, eliminating or even nulliying the chance of accident throughout the development of a construction work. Applications/Originality/Value: This research will hopefully provide benefits to the construction world by presenting work accidents prevention methods by incorporating risk elements into each level of project work in the Work Breakdown Structure which will be used as input in the making of a safety plan.

Original languageEnglish
Article number012073
JournalJournal of Physics: Conference Series
Volume1858
Issue number1
DOIs
Publication statusPublished - 22 Apr 2021
Event7th International Conference on Engineering, Technology, and Industrial Application, ICETIA 2020 - Virtual, Online, Indonesia
Duration: 8 Dec 20209 Dec 2020

Fingerprint

Dive into the research topics of 'Development of work breakdown structure standard for safety planning on stadium construction work based on risk'. Together they form a unique fingerprint.

Cite this