Development of work breakdown structure standard based on risk for safety planning on dam construction work

Defi Nurul Hidayah, Yusuf Latief, Leni Sagita Riantini

Research output: Contribution to journalConference articlepeer-review

7 Citations (Scopus)

Abstract

Work activities on construction projects can experience disruptions caused by various things, one of the causes is the occurrence of work accidents. Identification and early analysis of potential hazards in each work packet, work methods, work activities, resources and environments in the WBS (Work Breakdown Structure) can prevent work accidents. Thus the need for WBS standardization is very important in presenting the assessment of risk, impact and frequency arising from workplace accidents. The purpose of this study was to develop a risk-based WBS standard for safety planning on dam construction. The results of this study are WBS standards, implementation methods, activities, potential hazard risks, safety planning using risk-based WBS standards, WBS dictionaries and WBS checklists on dam construction work, as an effort in preventing, reducing or eliminating the accident in dam construction work.

Original languageEnglish
Article number012003
JournalIOP Conference Series: Materials Science and Engineering
Volume420
Issue number1
DOIs
Publication statusPublished - 1 Oct 2018
Event2nd Nommensen International Conference on Technology and Engineering, NICTE 2018 - Medan, Indonesia
Duration: 19 Jul 201820 Jul 2018

Fingerprint

Dive into the research topics of 'Development of work breakdown structure standard based on risk for safety planning on dam construction work'. Together they form a unique fingerprint.

Cite this