Development of WBS (Work Breakdown Structure) risk based standard for safety planning at seaport project

T. A. Susiawan, Y. Latief, L. S. Riantini

Research output: Contribution to journalConference articlepeer-review

6 Citations (Scopus)

Abstract

A construction project consist of many activities. In order to make it easier to manage, the activities broken down into smaller one that called work package. Meanwhile the work on the construction project and its elements is relatively similar and this can be standardized and used as the basis for a universal program for construction works. Standardization of the WBS will enable the automation of the project planning process and hence will minimize the occurrence of work accidents on construction project. The aim of this study is to develop a risk based WBS standard for seaport project, identify source of potentially dangerous risk may occur and to develop safety plan using a standardized risk based WBS, this will be a way to preventing, reducing and nullifying the risk of workplace accidents to obtain zero accidents in a construction site. The scope of this study is sea port construction project only.

Original languageEnglish
Article number012007
JournalJournal of Physics: Conference Series
Volume1360
Issue number1
DOIs
Publication statusPublished - 25 Oct 2019
Event1st International Symposium on Sciences, Engineering, and Technology, ISSET 2018 - Cirebon, Indonesia
Duration: 19 Nov 201820 Nov 2018

Fingerprint

Dive into the research topics of 'Development of WBS (Work Breakdown Structure) risk based standard for safety planning at seaport project'. Together they form a unique fingerprint.

Cite this