Development of WBS (Work Breakdown Structure) dictionary and checklist of mechanical and electrical works in stadium construction for safety planning

R. S. Ramadhanty, L. S.R. Supriadi, Y. Latief

Research output: Contribution to journalConference articlepeer-review

Abstract

In a construction project, an organizing tool is important to specify every activity that should be done during the project and to keep everything on track. Organizing tool also can be developed to safety planning to ensure safety of the labours. Safety is priority of a project because once accident is happened, it causes many kind of losses; direct cost, indirect cost, time loss, life loss, project delays. Nowadays, not every project has implemented that organizing tool. Here reported the discovery of organizing tool called WBS and developed to safety planning, on mechanical electrical works in stadium construction project. On this research, shows that mechanical and electrical works in stadium construction's work breakdown structure detailed to four levels, and can be developed to WBS dictionary and checklist to bring ease for the construction itself. WBS dictionary and checklist can also developed to safety planning. It shows that WBS complementary such WBS dictionary and checklist can be used for safety planning, and ease project construction's life.

Original languageEnglish
Article number012002
JournalIOP Conference Series: Earth and Environmental Science
Volume794
Issue number1
DOIs
Publication statusPublished - 2 Aug 2021
Event4th International Conference on Eco Engineering Development 2020, ICEED 2020 - Banten, Indonesia
Duration: 10 Nov 202011 Nov 2020

Keywords

  • Mechanical and Electrical
  • Safety Planning
  • Stadium
  • WBS
  • WBS Checklist
  • WBS Dictionary