T1 - Development of WBS (work breakdown structure) dictionary and checklist for safety planning of tunnel construction
AU - Dewi, N. A.
AU - Supriadi, L. S.R.
AU - Latief, Y.
N1 - Funding Information:
The authors would like to thank the financial support provided by University of Indonesia through the PUTI 2020 NKB-1132/UN2.RST/HKP.05.00/2020 funding scheme managed by Directorate for Research and Public Services (DRPM) University of Indonesia.
Publisher Copyright:
© 2020 IOP Conference Series: Materials Science and Engineering.
Copyright:
Copyright 2021 Elsevier B.V., All rights reserved.
PY - 2020/12/30
Y1 - 2020/12/30
N2 - Indonesia develops tunnel technology due to country's contours and geological conditions that are rich in minerals, and to overcome congestion problems in big cities. Tunnel is one of the alternative transportation infrastructure in the future that allows to shorten the travel time. Tunnel construction itself is a complex type of construction and requires high managerial and technical capabilities in the process. Therefore, an excellent and detailed planning is needed for each tunnel project, for example by using WBS dictionary and checklist for safety planning in tunnel construction. The purpose of this study is to identify in detail the work packages, methods, activities, and resources to reduce the risk of workplace accidents. This research consists of several stages with qualitative methods. The methodology used is expert validation, respondent surveys and interviews and analyzed using descriptive data mode analysis. The result of this study are WBS dictionary and checklist that provide activities and resources information, which can support the safety planning documents by identifying safety risks on tunnel construction projects.
AB - Indonesia develops tunnel technology due to country's contours and geological conditions that are rich in minerals, and to overcome congestion problems in big cities. Tunnel is one of the alternative transportation infrastructure in the future that allows to shorten the travel time. Tunnel construction itself is a complex type of construction and requires high managerial and technical capabilities in the process. Therefore, an excellent and detailed planning is needed for each tunnel project, for example by using WBS dictionary and checklist for safety planning in tunnel construction. The purpose of this study is to identify in detail the work packages, methods, activities, and resources to reduce the risk of workplace accidents. This research consists of several stages with qualitative methods. The methodology used is expert validation, respondent surveys and interviews and analyzed using descriptive data mode analysis. The result of this study are WBS dictionary and checklist that provide activities and resources information, which can support the safety planning documents by identifying safety risks on tunnel construction projects.
UR - http://www.scopus.com/inward/record.url?scp=85100003863&partnerID=8YFLogxK
U2 - 10.1088/1757-899X/1007/1/012009
DO - 10.1088/1757-899X/1007/1/012009
M3 - Conference article
AN - SCOPUS:85100003863
VL - 1007
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
SN - 1757-8981
IS - 1
M1 - 012009
T2 - 3rd Tarumanagara International Conference of the Applications of Technology and Engineering, TICATE 2020
Y2 - 3 August 2020 through 4 August 2020
ER -