Development of standardized WBS (work breakdown structure) based on risk for cost control of steel bridge construction projects

Ardiyanto Nugroho, Yusuf Latief

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The steel bridge construction project can be successful if the definition of project scope is in accordance with the requirements. WBS is a smalles work item and easily controlled. WBS standardization is very important because it will greatly affect the cost control. The purpose of this research is to develop WBS in steel bridges based on the regulation of the General Specification of Highways 2010 Revision 3 and Special Specification of Toll Roads 2017 from Toll Road Regulatory Agency (BPJT) for controlling project cost. The results of this study is we can get WBS standards by analyzing possible risks that may affect controlling project cost. So it is expected to assist the contractor in the cost control of steel bridge construction projects.

Original languageEnglish
Title of host publicationProceedings of the International Conference on Industrial Engineering and Operations Management, IEOM 2018
PublisherIEOM Society
Pages3479-3485
Number of pages7
ISBN (Print)9781532359446
Publication statusPublished - 1 Jan 2018
Event8th International Conference on Industrial Engineering and Operations Management, IEOM 2018 - Bandung, Indonesia
Duration: 6 Mar 20188 Mar 2018

Publication series

NameProceedings of the International Conference on Industrial Engineering and Operations Management
Volume2018-March
ISSN (Electronic)2169-8767

Conference

Conference8th International Conference on Industrial Engineering and Operations Management, IEOM 2018
Country/TerritoryIndonesia
CityBandung
Period6/03/188/03/18

Keywords

  • Cost control
  • Risk factor
  • WBS standard

Fingerprint

Dive into the research topics of 'Development of standardized WBS (work breakdown structure) based on risk for cost control of steel bridge construction projects'. Together they form a unique fingerprint.

Cite this