Development of risk-based standardized work breakdown structure for quality planning of airport construction project

A. Ramadhan, Y. Latief, L. Sagita

Research output: Contribution to journalConference articlepeer-review

1 Citation (Scopus)

Abstract

Airport project construction can be successful if the definition of project scope in accordance with the requirements. Although each airport project is unique, it can be standardized in their activities to enable the provision of a stronger forecast for project management. In fact, Airport project construction in Indonesia are still many that are not in accordance with the planning in terms of quality so that can affect the quality of the project. In consequence, the development of risk-based WBS (Work breakdown Structure) is proposed. The objective of the study was to develop risk-based WBS standard for airport project that can be a reference in airport construction projects to achieve project quality. The research consisted of several stages with qualitative risk analysis method. The methodology used is expert validation, respondent survey and interview and analyzed using risk analysis. The results of this study are WBS standards, implementation methods, activities, risks, and quality planning using risk-based WBS standards.

Original languageEnglish
Article number012005
JournalJournal of Physics: Conference Series
Volume1360
Issue number1
DOIs
Publication statusPublished - 25 Oct 2019
Event1st International Symposium on Sciences, Engineering, and Technology, ISSET 2018 - Cirebon, Indonesia
Duration: 19 Nov 201820 Nov 2018

Fingerprint

Dive into the research topics of 'Development of risk-based standardized work breakdown structure for quality planning of airport construction project'. Together they form a unique fingerprint.

Cite this