Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Preparatory, Instrumentation and Control Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance

Fista Septianingtias, Leni Sagita Riantini, Yusuf Latief

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Fingerprint

Dive into the research topics of 'Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Preparatory, Instrumentation and Control Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance'. Together they form a unique fingerprint.

Business & Economics

Engineering & Materials Science