TY - GEN
T1 - Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Preparatory, Instrumentation and Control Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance
AU - Septianingtias, Fista
AU - Riantini, Leni Sagita
AU - Latief, Yusuf
N1 - Publisher Copyright:
© IEOM Society International.
PY - 2021
Y1 - 2021
N2 - There is always uncertainty when implementing a project using an EPC contract, as the projects involved are very complex and risk affecting the performance of the project. Since one of these is the time performance of the project, it is necessary to identify the risks that may affect the time performance in order to minimize the decrease in the time performance so that the project can proceed according to the goal. It is necessary to develop a risk-based WBS to avoid poor time performance in the project implementation process. Because WBS is an effective tool for project management in planning and implementing a successful project. This study aims to develop risk-based WBS standards for CFSPP construction project preparatory, instrumentation and control works to improve time performance. The results of this study are WBS standards for the preparatory, instrumentation and control works of CFSPP construction projects consisting of eight (8) levels up to resources, 14 risk factors with the highest ranking in all risk categories, and 5 groups of risk response recommendations for improving time performance as the development of WBS standards
AB - There is always uncertainty when implementing a project using an EPC contract, as the projects involved are very complex and risk affecting the performance of the project. Since one of these is the time performance of the project, it is necessary to identify the risks that may affect the time performance in order to minimize the decrease in the time performance so that the project can proceed according to the goal. It is necessary to develop a risk-based WBS to avoid poor time performance in the project implementation process. Because WBS is an effective tool for project management in planning and implementing a successful project. This study aims to develop risk-based WBS standards for CFSPP construction project preparatory, instrumentation and control works to improve time performance. The results of this study are WBS standards for the preparatory, instrumentation and control works of CFSPP construction projects consisting of eight (8) levels up to resources, 14 risk factors with the highest ranking in all risk categories, and 5 groups of risk response recommendations for improving time performance as the development of WBS standards
KW - Preparatory work and instrumentation control work
KW - Risk factors
KW - Time performance and Coal-Fired Steam Power Plant
KW - WBS
UR - http://www.scopus.com/inward/record.url?scp=85126039072&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:85126039072
SN - 9781792361265
T3 - Proceedings of the International Conference on Industrial Engineering and Operations Management
SP - 673
EP - 683
BT - Proceedings - 2021 IEOM China Conference in Harbin
A2 - Ali, Ahad
A2 - Linton, A. Leon
PB - IEOM Society
T2 - 1st Asia Pacific International Conference on Industrial Engineering and Operations Management, IEOM 2021
Y2 - 9 July 2021 through 11 July 2021
ER -