Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Preparatory, Instrumentation and Control Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance

Fista Septianingtias, Leni Sagita Riantini, Yusuf Latief

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

There is always uncertainty when implementing a project using an EPC contract, as the projects involved are very complex and risk affecting the performance of the project. Since one of these is the time performance of the project, it is necessary to identify the risks that may affect the time performance in order to minimize the decrease in the time performance so that the project can proceed according to the goal. It is necessary to develop a risk-based WBS to avoid poor time performance in the project implementation process. Because WBS is an effective tool for project management in planning and implementing a successful project. This study aims to develop risk-based WBS standards for CFSPP construction project preparatory, instrumentation and control works to improve time performance. The results of this study are WBS standards for the preparatory, instrumentation and control works of CFSPP construction projects consisting of eight (8) levels up to resources, 14 risk factors with the highest ranking in all risk categories, and 5 groups of risk response recommendations for improving time performance as the development of WBS standards

Original languageEnglish
Title of host publicationProceedings - 2021 IEOM China Conference in Harbin
EditorsAhad Ali, A. Leon Linton
PublisherIEOM Society
Pages673-683
Number of pages11
ISBN (Print)9781792361265
Publication statusPublished - 2021
Event1st Asia Pacific International Conference on Industrial Engineering and Operations Management, IEOM 2021 - Harbin, China
Duration: 9 Jul 202111 Jul 2021

Publication series

NameProceedings of the International Conference on Industrial Engineering and Operations Management
ISSN (Electronic)2169-8767

Conference

Conference1st Asia Pacific International Conference on Industrial Engineering and Operations Management, IEOM 2021
Country/TerritoryChina
CityHarbin
Period9/07/2111/07/21

Keywords

  • Preparatory work and instrumentation control work
  • Risk factors
  • Time performance and Coal-Fired Steam Power Plant
  • WBS