Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Mechanical and Electrical Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance

Adnin Fairuzy Putri, Leni Sagita Riantini, Yusuf Latief

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The construction of a Coal-Fired Steam Power Plant in Indonesia has a high urgency to be realized in a short period. However, many significant factors arise during mechanical and electrical works that cause delays. Therefore, contractors need to plan the project carefully by anticipating all possibilities to minimize potential delays. With WBS, delay risks can be identified in smaller elements up to the resources level to avoid project time overrun effectively. This study aims to develop a risk-based WBS standard to improve mechanical and electrical works' time performance in Coal-Fired Steam Power Plant Construction Projects. Data was collected using questionnaire surveys from contractors involved in Coal-Fired Steam Power Plant Construction Projects and analyzed using the Delphi method and qualitative risk analysis. The result of this study is a WBS standard for mechanical and electrical works of a Coal-Fired Steam Power Plant Construction Project that contains the scope of works up to 8 levels. This study also identifies 47 responses of the 13 highest risks which affect project time performance as input for riskbased standardized WBS development to prevent, reduce, or eliminate possible events that can delay the completion of the Construction Project.

Original languageEnglish
Title of host publicationProceedings - 2021 IEOM China Conference in Harbin
EditorsAhad Ali, A. Leon Linton
PublisherIEOM Society
Pages649-660
Number of pages12
ISBN (Print)9781792361265
Publication statusPublished - 2021
Event1st Asia Pacific International Conference on Industrial Engineering and Operations Management, IEOM 2021 - Harbin, China
Duration: 9 Jul 202111 Jul 2021

Publication series

NameProceedings of the International Conference on Industrial Engineering and Operations Management
ISSN (Electronic)2169-8767

Conference

Conference1st Asia Pacific International Conference on Industrial Engineering and Operations Management, IEOM 2021
Country/TerritoryChina
CityHarbin
Period9/07/2111/07/21

Keywords

  • And Time performance
  • Coal-Fired Steam Power Plant
  • Mechanical and electrical works
  • Risk factors
  • WBS standard

Fingerprint

Dive into the research topics of 'Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Mechanical and Electrical Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance'. Together they form a unique fingerprint.

Cite this