Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of road construction project

Rahmanita Ayu Amini, Yusuf Latief

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

3 Citations (Scopus)

Abstract

Provision of roads provides access for rural and marine communities to health, education, employment and other necessary social services. A road construction project with the WBS (Work Breakdown Structure) as a result of poor planning can affect the quality of the project. WBS is very important in the management planning process by turning it into phases, and work packages. Risk-based WBS standardization is one that can be a reference in road construction projects to achieve project quality. The most dominant risk variables were chosen using questionnaires and analyzed using SPSS (Package Statistics for Social Sciences) then added to the WBS arrangement in order to obtain results that were accurate results.

Original languageEnglish
Title of host publicationProceedings of the International Conference on Industrial Engineering and Operations Management, IEOM 2018
PublisherIEOM Society
Pages2593-2602
Number of pages10
ISBN (Print)9781532359446
Publication statusPublished - 2018
Event8th International Conference on Industrial Engineering and Operations Management, IEOM 2018 - Bandung, Indonesia
Duration: 6 Mar 20188 Mar 2018

Publication series

NameProceedings of the International Conference on Industrial Engineering and Operations Management
Volume2018-March
ISSN (Electronic)2169-8767

Conference

Conference8th International Conference on Industrial Engineering and Operations Management, IEOM 2018
Country/TerritoryIndonesia
CityBandung
Period6/03/188/03/18

Keywords

  • Quality
  • Risk
  • Road construction
  • WBS

Fingerprint

Dive into the research topics of 'Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of road construction project'. Together they form a unique fingerprint.

Cite this