TY - JOUR
T1 - Development of prototype claims management system to minimize dispute in infrastructure projects with design build contract
AU - Hayati, Kemala
AU - Latief, Yusuf
AU - Santos, Ahmad Jaka
N1 - Publisher Copyright:
© IAEME Publication.
PY - 2018/7
Y1 - 2018/7
N2 - The success of a construction project depends on the cooperation among the contractor, consultant, and project owner. Different perception among these parties that leads to conflict will turn into dispute when it is not managed properly. Disputes in the construction surely have a major impact on the project implementation such as costs and time, while the problems and disputes may arise from conflicting opinions among stakeholders on various aspects, both on the design and construction. It is undoubtedly that without an efficient system in managing conflicts and claims, disputes among parties will continue. Thus, it is necessary to have an integrated claims management system consists several phases in the project implementation, i.e. the phase in which the project has not been implemented, when the claim and dispute has occurred, starting with risk allocation and its prevention, contract management strategies, administrative processes and claim documentation, and dispute resolution. The system is intended as a communication platform among owners, planners, and contractors, to develop an automated and flexible mechanism based on the web that will be used by practitioners, in this case the contractor and owner, as guidance in implementing the project especially on infrastructure projects with design build contract. The implementation of this claims management system will assist in reducing the occurrence of disputes and thus improving the construction projects performance.
AB - The success of a construction project depends on the cooperation among the contractor, consultant, and project owner. Different perception among these parties that leads to conflict will turn into dispute when it is not managed properly. Disputes in the construction surely have a major impact on the project implementation such as costs and time, while the problems and disputes may arise from conflicting opinions among stakeholders on various aspects, both on the design and construction. It is undoubtedly that without an efficient system in managing conflicts and claims, disputes among parties will continue. Thus, it is necessary to have an integrated claims management system consists several phases in the project implementation, i.e. the phase in which the project has not been implemented, when the claim and dispute has occurred, starting with risk allocation and its prevention, contract management strategies, administrative processes and claim documentation, and dispute resolution. The system is intended as a communication platform among owners, planners, and contractors, to develop an automated and flexible mechanism based on the web that will be used by practitioners, in this case the contractor and owner, as guidance in implementing the project especially on infrastructure projects with design build contract. The implementation of this claims management system will assist in reducing the occurrence of disputes and thus improving the construction projects performance.
KW - Claim
KW - Contract management
KW - Dispute
KW - Resolution
KW - Risk
KW - Web-based system
UR - http://www.scopus.com/inward/record.url?scp=85052385256&partnerID=8YFLogxK
M3 - Article
AN - SCOPUS:85052385256
SN - 0976-6308
VL - 9
SP - 1370
EP - 1377
JO - International Journal of Civil Engineering and Technology
JF - International Journal of Civil Engineering and Technology
IS - 7
M1 - IJCIET_09_07_144
ER -