TY - GEN
T1 - Development of Preventive Maintenance Guidelines for Electrical Components on Government Building Based on Work Breakdown Structure
AU - Pradipta, Azhara Yudha
AU - Latief, Yusuf
AU - Machfudiyanto, Rossy Armyn
N1 - Funding Information:
The authors would like to thank the members of the Maintenance Building Team who have helped researchers to provide support in the form of both financial and moral support in completing this research.
Publisher Copyright:
© 2023, The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
PY - 2023
Y1 - 2023
N2 - This research aims to create preventive maintenance guidelines for electrical components in buildings, especially government buildings, by breaking down electrical components using work breakdown structures so that the identification of electrical components is complete and well-structured. The methodology used in this research uses archive analysis with validation by experts through a questionnaire based on the legislations and applicable research and previous research. The results of this research are guidelines for preventive maintenance for electrical components in government buildings that contain preventive maintenance steps for each component at an alternative design level with a time interval for each component. Preventive maintenance guidelines for electrical components in this building are formed using work breakdown structure described from level 1 to level 4 with their derivatives, namely alternative designs. From the results of the validation, there are 22 (twenty-two) work packages and 45 (forty-five) alternative designs for electrical components in buildings that need preventive maintenance with each activity, procedure and preventive action and time intervals.
AB - This research aims to create preventive maintenance guidelines for electrical components in buildings, especially government buildings, by breaking down electrical components using work breakdown structures so that the identification of electrical components is complete and well-structured. The methodology used in this research uses archive analysis with validation by experts through a questionnaire based on the legislations and applicable research and previous research. The results of this research are guidelines for preventive maintenance for electrical components in government buildings that contain preventive maintenance steps for each component at an alternative design level with a time interval for each component. Preventive maintenance guidelines for electrical components in this building are formed using work breakdown structure described from level 1 to level 4 with their derivatives, namely alternative designs. From the results of the validation, there are 22 (twenty-two) work packages and 45 (forty-five) alternative designs for electrical components in buildings that need preventive maintenance with each activity, procedure and preventive action and time intervals.
KW - Government building
KW - Guideline
KW - Preventive maintenance
KW - Work breakdown structure
UR - http://www.scopus.com/inward/record.url?scp=85137808568&partnerID=8YFLogxK
U2 - 10.1007/978-981-16-9348-9_31
DO - 10.1007/978-981-16-9348-9_31
M3 - Conference contribution
AN - SCOPUS:85137808568
SN - 9789811693472
T3 - Lecture Notes in Civil Engineering
SP - 355
EP - 367
BT - Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering - ICRMCE 2021
A2 - Kristiawan, Stefanus Adi
A2 - Gan, Buntara S.
A2 - Shahin, Mohamed
A2 - Sharma, Akanshu
PB - Springer Science and Business Media Deutschland GmbH
T2 - 5th International Conference on Rehabilitation and Maintenance in Civil Engineering, ICRMCE 2021
Y2 - 8 July 2021 through 9 July 2021
ER -