TY - GEN
T1 - Developing performance measurement system of management maintenance in government building
AU - Ajiprasetyo, Epo Ilham
AU - Latief, Yusuf
N1 - Publisher Copyright:
© IEOM Society International.
PY - 2018
Y1 - 2018
N2 - Development of construction in Indonesia per annum to increase. However, not in line with the normative basis of maintenance, impact on the acceleration of damage to building construction. The purpose of this paper is to identify the key aspects of performance measurement for maintenance management building, objects within Parliament Building and Environment Indonesia, to improve the quality of performance. The study was conducted qualitatively, by analyzing data on the perception of the questionnaire to the respondents who had experience in the project, and then the data were processed by Structural Equation Modeling (SEM) to get priority indicator factors. The study results showed that there were 63 events of the indicators which were identified as potentially dangerous, and 29 dominant indicators that affected the measurement performance. Furthermore, The results of the study are expected to improve the performance management and maintenance more efficiently and improve the economic, techical, social and environmental value.
AB - Development of construction in Indonesia per annum to increase. However, not in line with the normative basis of maintenance, impact on the acceleration of damage to building construction. The purpose of this paper is to identify the key aspects of performance measurement for maintenance management building, objects within Parliament Building and Environment Indonesia, to improve the quality of performance. The study was conducted qualitatively, by analyzing data on the perception of the questionnaire to the respondents who had experience in the project, and then the data were processed by Structural Equation Modeling (SEM) to get priority indicator factors. The study results showed that there were 63 events of the indicators which were identified as potentially dangerous, and 29 dominant indicators that affected the measurement performance. Furthermore, The results of the study are expected to improve the performance management and maintenance more efficiently and improve the economic, techical, social and environmental value.
KW - Building management
KW - Developing
KW - Maintenance management
KW - Performance measurement KPIs
KW - SEM
UR - http://www.scopus.com/inward/record.url?scp=85051511862&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:85051511862
SN - 9781532359446
T3 - Proceedings of the International Conference on Industrial Engineering and Operations Management
SP - 2620
EP - 2624
BT - Proceedings of the International Conference on Industrial Engineering and Operations Management, IEOM 2018
PB - IEOM Society
T2 - 8th International Conference on Industrial Engineering and Operations Management, IEOM 2018
Y2 - 6 March 2018 through 8 March 2018
ER -