T1 - Cost Structure of Construction Safety on High Residential Buildings in Indonesia
AU - Fitriani, Ratih
AU - Latief, Yusuf
AU - Machfudiyanto, Rossy A.
N1 - Funding Information:
Acknowledgements The Authors would like to thank the financial support provided by Ministry of Research and Technology/National Research and Innovation Agency through PDUPT Grant 2021 with contract number: NKB-219/UN2.RST/HKP.05.00/2021 managed by the Directorate for Research and Community Engagement (DRPM) Ministry of Research and Technology/National Research and Innovation Agency (BRIN).
Publisher Copyright:
© 2023, The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd.
PY - 2023
Y1 - 2023
N2 - The plan for the Cost implementation of Construction Safety Management System in the Public Works and Housing Ministry sector is part of the Construction Safety Plan, which is agreed upon and approved at the preparatory meeting for the implementation of construction work (Pre Construction Meeting). This study aims to identify and analyze the cost structure of safety in high residential buildings in Indonesia. The methodology used in this study is to use Bill of Quantity data from 16 projects in various regions in Indonesia and then analyzed using the Monte Carlo software to determine the optimal cost of safety. The results of this study indicate that the component of expert consultation related to construction safety is the least priority component, followed by the insurance and licensing component, then the construction safety personnel component which is not prioritized. For the construction safety personnel component, according to the construction cost budgeting, the personnel cost has been included, so that it is no longer budgeted for construction safety costs.
AB - The plan for the Cost implementation of Construction Safety Management System in the Public Works and Housing Ministry sector is part of the Construction Safety Plan, which is agreed upon and approved at the preparatory meeting for the implementation of construction work (Pre Construction Meeting). This study aims to identify and analyze the cost structure of safety in high residential buildings in Indonesia. The methodology used in this study is to use Bill of Quantity data from 16 projects in various regions in Indonesia and then analyzed using the Monte Carlo software to determine the optimal cost of safety. The results of this study indicate that the component of expert consultation related to construction safety is the least priority component, followed by the insurance and licensing component, then the construction safety personnel component which is not prioritized. For the construction safety personnel component, according to the construction cost budgeting, the personnel cost has been included, so that it is no longer budgeted for construction safety costs.
KW - Construction safety
KW - Cost structure
KW - High residential buildings
UR - http://www.scopus.com/inward/record.url?scp=85137752743&partnerID=8YFLogxK
U2 - 10.1007/978-981-16-9348-9_58
DO - 10.1007/978-981-16-9348-9_58
M3 - Conference contribution
AN - SCOPUS:85137752743
SN - 9789811693472
T3 - Lecture Notes in Civil Engineering
SP - 659
EP - 667
BT - Proceedings of the 5th International Conference on Rehabilitation and Maintenance in Civil Engineering - ICRMCE 2021
A2 - Kristiawan, Stefanus Adi
A2 - Gan, Buntara S.
A2 - Shahin, Mohamed
A2 - Sharma, Akanshu
PB - Springer Science and Business Media Deutschland GmbH
T2 - 5th International Conference on Rehabilitation and Maintenance in Civil Engineering, ICRMCE 2021
Y2 - 8 July 2021 through 9 July 2021
ER -