TY - GEN
T1 - Cost estimation of biomedical implant miniplate related to process complexity
AU - Lassandy, Marthan
AU - Budiono, Hendri D.S.
AU - Supriadi, Sugeng
N1 - Funding Information:
The authors would like to thank Research Grant “Publikasi Terindeks Internasional Untuk Tugas Akhir Mahasiswa UI 2018”. Our grateful thank also addressed to BBLM Ministry of Industrial for valuable support to conduct this research.
Publisher Copyright:
© 2018 Author(s).
PY - 2018/8/28
Y1 - 2018/8/28
N2 - Manufacturing is an activity of processing raw materials into semi-finished or finished products. In addition to manufacturing processes within the industry are product design, material selection, material distribution needed to create a product. A product produced from a manufacturing system, has an index of product complexity that illustrates that the product is made with a certain degree of complexity. The process done on the production of miniplate implants is The process of forming an outside profile, Slicing process, The hole process, Micro Finishing, and Ultrasonic Cleaning. The highest level of complexity is in the set up outside profile forming that is 5.26 and the highest cost lies in the operational process hole process that is 109.251 rupiah. Quantitative methods used are feature-based cost, operation-based cost, and breakdown approach. feature based cost consists of cost by feature that is the cost of outside profile, Slicing process, The hole process, Micro Finishing, and Ultrasonic Cleaning. Operation based cost consists of set up, operation, and unloading. Breakdown Approach consists of cost set tool, set workpiece, and programming on set up, operator cost, material, overhead, energy, and tool, unloading cost consists of release tool cost and release workpiece. Total index of miniplate implant process complexity is 40.7and cost of the overall miniplate implant production is 271,844.23 rupiah.
AB - Manufacturing is an activity of processing raw materials into semi-finished or finished products. In addition to manufacturing processes within the industry are product design, material selection, material distribution needed to create a product. A product produced from a manufacturing system, has an index of product complexity that illustrates that the product is made with a certain degree of complexity. The process done on the production of miniplate implants is The process of forming an outside profile, Slicing process, The hole process, Micro Finishing, and Ultrasonic Cleaning. The highest level of complexity is in the set up outside profile forming that is 5.26 and the highest cost lies in the operational process hole process that is 109.251 rupiah. Quantitative methods used are feature-based cost, operation-based cost, and breakdown approach. feature based cost consists of cost by feature that is the cost of outside profile, Slicing process, The hole process, Micro Finishing, and Ultrasonic Cleaning. Operation based cost consists of set up, operation, and unloading. Breakdown Approach consists of cost set tool, set workpiece, and programming on set up, operator cost, material, overhead, energy, and tool, unloading cost consists of release tool cost and release workpiece. Total index of miniplate implant process complexity is 40.7and cost of the overall miniplate implant production is 271,844.23 rupiah.
UR - http://www.scopus.com/inward/record.url?scp=85054326379&partnerID=8YFLogxK
U2 - 10.1063/1.5051975
DO - 10.1063/1.5051975
M3 - Conference contribution
AN - SCOPUS:85054326379
SN - 9780735417243
T3 - AIP Conference Proceedings
BT - International Conference on Advanced Materials, Structures and Mechanical Engineering, ICAMSME 2018
A2 - Ahn, Jungkyu
A2 - Hu, Jongwan
PB - American Institute of Physics Inc.
T2 - 2018 5th International Conference on Advanced Materials, Structures and Mechanical Engineering, ICAMSME 2018
Y2 - 18 May 2018 through 20 May 2018
ER -