Construction safety risks identification of integrated utility network facilities (IUNF) project in DKI Jakarta Province

Josua Lumban Gaol, Rossy Armyn Machfudiyanto

Research output: Contribution to journalConference articlepeer-review

Abstract

DKI Jakarta Province implements the construction program of the Integrated Utility Network Facility (IUNF) to prevent repeated excavation and demolition of road bodies Construction work is one of the industries with the highest level of accident risk in the world. Likewise with construction projects in Indonesia, including DKI Jakarta Province, which is implementing the IUNF development program. One of the causes of the high rate of workplace accidents is unsafe conditions caused by poor safety management that cannot identify construction safety risks thoroughly. For this reason, good and reliable construction safety management is needed by identifying every risk that may occur and then conducting qualitative analyses to determine the level of each risk. Risk identification is carried out by first describing IUNF or Work Breakdown Structure (WBS) construction activities.

Original languageEnglish
Article number03012
JournalE3S Web of Conferences
Volume405
DOIs
Publication statusPublished - 26 Jul 2023
Event2023 International Conference on Sustainable Technologies in Civil and Environmental Engineering, ICSTCE 2023 - Pune, India
Duration: 15 Jun 202316 Jun 2023

Fingerprint

Dive into the research topics of 'Construction safety risks identification of integrated utility network facilities (IUNF) project in DKI Jakarta Province'. Together they form a unique fingerprint.

Cite this