Abstract
The adoption of digital technology in the construction industry is required to improve project performance. The aim of this research is to evaluate schedule performance improvement using the IoT platform and to propose a new Chief-Screen 1.0 model. The Value Engineering method combined with qualitative analysis using NVivo software is used. The research involved group interviews with 27 respondents from the construction industry, and interviews with four experts related to the project case study. The results of the IoT platform evaluation show that it improves schedule performance by 29.5%, by helping users to collect data and undertake information exchange with optimal processes, efficiency and improvement in validity. IoT platform users are more productive, as they have more time to identify problems and find solutions. The use of IoT can improve schedule performance from the weakness of fast-tracking acceleration and balanced matrix organization. Chief-screen 1.0 is a platform to omit digital technology disruption in the construction industry.
Original language | English |
---|---|
Pages (from-to) | 1249-1257 |
Number of pages | 9 |
Journal | Procedia Computer Science |
Volume | 161 |
DOIs | |
Publication status | Published - 1 Jan 2019 |
Event | 5th Information Systems International Conference, ISICO 2019 - Surabaya, Indonesia Duration: 23 Jul 2019 → 24 Jul 2019 |
Keywords
- Balanced matrix organizational
- Fast tracking
- Industrial building project
- Industrial revolution
- Internet of things
- Virtual project