N2 - The construction service industry is a sensitive and a complex industry and has a fairly high construction uncertainty, related to the development of processes, methods, construction techniques, and the natural conditions factor in construction activities, and often result to claims. Claims can occur both from users or contractor due to perception differences from the initial agreement that has been stated in a construction contract. Construction claims appear as a result of problems in aspects of organization, planning, and contracts. A claim can be described as an administrative tool to correct failures that occur in the construction process. The application of good claim management will be able to avoid dispute that will have an impact on cost overrun and time overrun. This study aims to identify the factors that cause the occurrence of claims during the construction work and identify the problems in each claim management process. The study was conducted by collecting questionnaire data to respondents, practitioners from the owner, contractor and consultant. Data analysis was performed using qualitative analysis (descriptive analysis) to determine the highest score of respondents' opinions regarding the causes of claims and problems that occur in each claim submission process so that an effective and efficient claim submission process is produced.
AB - The construction service industry is a sensitive and a complex industry and has a fairly high construction uncertainty, related to the development of processes, methods, construction techniques, and the natural conditions factor in construction activities, and often result to claims. Claims can occur both from users or contractor due to perception differences from the initial agreement that has been stated in a construction contract. Construction claims appear as a result of problems in aspects of organization, planning, and contracts. A claim can be described as an administrative tool to correct failures that occur in the construction process. The application of good claim management will be able to avoid dispute that will have an impact on cost overrun and time overrun. This study aims to identify the factors that cause the occurrence of claims during the construction work and identify the problems in each claim management process. The study was conducted by collecting questionnaire data to respondents, practitioners from the owner, contractor and consultant. Data analysis was performed using qualitative analysis (descriptive analysis) to determine the highest score of respondents' opinions regarding the causes of claims and problems that occur in each claim submission process so that an effective and efficient claim submission process is produced.
UR - http://www.scopus.com/inward/record.url?scp=85061007898&partnerID=8YFLogxK
U2 - 10.1088/1757-899X/469/1/012082
DO - 10.1088/1757-899X/469/1/012082
M3 - Conference article
AN - SCOPUS:85061007898
SN - 1757-8981
VL - 469
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
IS - 1
M1 - 012082
T2 - 1st International Postgraduate Conference on Mechanical Engineering, IPCME 2018
Y2 - 31 October 2018 through 31 October 2018
ER -